My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150385 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150385 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2016 1:34:49 PM
Creation date
2/5/2014 11:48:01 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-018
C150385
Contractor Name
Beeman Irrigating Ditch and Milling Company
Contract Type
Loan
Water District
2
County
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Emergency Loan Application and Feasibility Study <br />Project Background <br />Project Olvnership <br />Beeman Irrigating Ditch and Milling Co. <br />The Beeman Irrigating Ditch and Milling Company (Beeman) and its sister company, Meadow <br />Island No. 2 (MI2), jointly operate a diversion dam on the South Platte River and a sand <br />bypass /dam, headgate, measurement flume, and bifurcation structure (jointly referred to as the <br />"headworks" in this document) (see attached location map). The operation and maintenance of <br />these structures is governed by a 1925 agreement between the companies which allocates the <br />costs and responsibilities associated with these structures (Beeman is allocated 75% of costs, <br />MI2 is allocated 25% of costs). The Beeman has an outstanding loan with CWCB to address the <br />replacement of the dam in the South Platte River (completed in the early 1980s). Under that <br />agreement, Beeman assesses MI2 for its portion of the annual repayment obligation. Beeman <br />and MI2 propose to maintain that arrangement if Beeman is awarded a loan for the work <br />proposed under the current feasibility study and loan request to CWCB. <br />The Beeman /MI2 ownership is relatively complex. Beeman is a shareholder in MI2 and owns <br />approximately 13.33% of MI2's outstanding shares. The remaining MI2 shares are owned by <br />agricultural entities. Beeman has mixed industrial /agricultural ownership and 51% of its <br />outstanding shares are owned by Public Service Company of Colorado (PSCo). The remaining <br />49% of its shares are owned by agricultural entities. According to Beeman's calculations, <br />including the Beeman ownership in MI2 and the cost allocation agreement, the industrial usage <br />of the joint diversion dam and headworks facility is 41.58% and the remaining 58.42% is <br />agricultural. Beeman is requesting that CWCB fund 100% of the cost during the construction <br />phase of the project (see tentative schedule). At the conclusion of construction and prior to <br />amortization, PSCo would reimburse CWCB for 100% of its share of fiends borrowed to <br />complete project engineering and construction. Other shareholders under Beeman and MI2 have <br />indicated that they may wish to do the same. Beeman proposes that the engineering and <br />construction costs be funded through CWCB to minimize complexity and contracting <br />requirements. <br />Beeman corporate documents are attached with this report. <br />Project Physical Infrastructure <br />The Beeman/Meadow Island No.2 (MI2) joint diversion headworks was constructed in the early <br />1900s. Beeman has an outstanding CWCB loan that was used to improve the diversion dam on <br />the South Platte River in the early 1980s. Pre -flood, water diverted at the dam was conveyed by <br />a relict braid to the joint Beeman/MI 2 headworks area (see attached pre -flood aerial photo). <br />Typical flows diverted at the joint headgate structure average approximately 60 cfs, serving a <br />total of 16 shareholders (10 Beeman and 6 MI2, including Beeman) and irrigating up to <br />approximately 5,030 acres under both canal systems. <br />Post - September 2013 flooding, the river deposited silt extensively at the existing diversion dam <br />in the river, embedding the structure in a sand bar (see post -flood aerial photo on Figure 1). In <br />conjunction with this siltation, a new channel was cut through the historic island, cutting off flow <br />