Laserfiche WebLink
Feasibility Study for the Plaza Project - Phase z: McDonald Ditch Implementation Project <br />Appendix C - Loan Application <br />(l \'( -B %%itcr Project Loan Application <br />Page 4 <br />Remaining :Nn:tal %tatunt.v <br />LcsA�ff Nall & Addreas Amount Pil)m at Deis <br />Now <br />2. Arc any of the abovr liabilities mm, to default. or been to default at any nrx to Ux past" <br />YLS NO ❑✓ if YLS. pimsc inve detailed ccplamuort. <br />±. Please provide a '±ncf r.arratvc arsrnpaon of xxines of funding. to a:?cttter. w the C WC'B. <br />which have been ccplor:d for If:ts Mro cc-t {l:camplcti uould be Banks. USDA Rural <br />Do-clogmcm- %RUS. %%atcr Rcwurccs and Power Dcvrlopiricnt Authority. C'okwado <br />Division of Local Government. etc.} Tic WDD oarinered w th the Covam Rto. . <br />Grande Restoraton Foundatwn for this project. Together they secured $400.000 <br />t4rougn NRCS EQ1P. CPP. and CCPI Programs. S295.000 through CWCB's WSRA <br />prograrn, 510.000 from Rio Grandc Carnty, and 5113.000 in -auW com nitments. <br />4. %1W collateral will }ou be oflmng for this loan'.' Pc+mu sSUCS irtludc a pdedgc af rrsrnues. <br />the prtslca itself. real aerate. water no.ts. Tie McOD can offef revenue from <br />assessments, a cert'cate of depos t in the am0Lr4 o' one annual paymeii. <br />or the project itseif. The WOD also nas 530.000 in sav-ngs for M s proect. <br />'[hc above statemems air true. to ITe best of m}• Imow loup: <br />Sigr!aturr of Applicant <br />P Name 'ate Hart <br />- <br />(tile President <br />ihttc March 22, 2012 <br />M <br />31 <br />