My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150334 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150334 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2015 12:52:27 PM
Creation date
2/4/2014 4:20:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-044
C150334
Contractor Name
McDonald Ditch Company
Contract Type
Loan
Water District
20
County
Rio Grande
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Feasibility Study for the Plaza Project —Phase z: McDonald Ditch Implementation Project <br />Appendix C — Loan Application <br />('N'('n Water Project Loan Application <br />Page 3 <br />Please list the names. addresses and phone nurn -cm of the Applicants' cngtnwn%l and <br />atto rr"s). <br />NAMI. ADDRESS and PHO \L <br />Laurie CWk, P.E. 881 Hwy 285 N. Monte V sta, CO 81144 (719>W -5114 <br />Rod Clark. P.E. 101 S Craft Dt Alamosa, CO 81101 (719)589.6432 <br />X. List any feasibility studies or usher imesueanons that have been completed or arc now m <br />progress for the praposni rroject. t: s:}. submit one spy of the study with this amlicatson <br />A'oasiailty study was Compicted and SuLIM trod to CWCB- Other relevant studios <br />include the 2001 Study 2007 Strategic Prat, and Plaza Plan. See loasibdRy study. <br />9. Estimated cost of the pnyect Please include esarruttcd engineering cents, and estimated <br />con: twction costs, d'known. <br />101.500 <br />Isumaux fmgmcrnng ('osta S____ <br />----- -- _ -_.__ -_.. <br />Estimated C'swsstructior. Costs: S 755.000 <br />Lstin=od Other Costs: $ 51.500 <br />f:stir -sited (oral Costs: S 908'000 <br />U. Loan amount and terms you ur requeramg <br />Requested Loar. Amount: S 70.000 <br />rerm(Iength)ofloam: 20 years .ai. ...... <br />Interest Rate: 2 5WO <br />Part C. - Project Sponsor Financial Information <br />ltnaase the CN'CB's Fund u , nwol•rinc fund, n is mpirtant that the proiect sponsor have the <br />f n -nc"A capacity to repay a :y loans madc'7y the ('NCH. ncc followir.g information is needed to <br />assist the C'N "C'B in a prchrimary assm%ricnt of the apphcani s financial capacity. Use project <br />sponsor will submit the three rust recent annual financial statements. <br />1. List any existing long -tern luabtim imuln -mart or indclitctincss that exceeds orst thousand <br />dollars. For example. sink loans. gat crrrrrnt agericy loans - !wnd issues, accounts payaNc. etc. <br />Include narics and addresses of lenders. amounts. due dates and matimty dates. <br />30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.