My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150334 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150334 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2015 12:52:27 PM
Creation date
2/4/2014 4:20:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-044
C150334
Contractor Name
McDonald Ditch Company
Contract Type
Loan
Water District
20
County
Rio Grande
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Feasibility Study for the Plaza Project - Phase z: McDonald Ditch Implementation Project <br />Figure 11. Power Poles Near the McDonald Ditch Diversion <br />7.3.5 Preserving the Old Sevenraile Plaza Bridge Pier <br />During the investigation of alternatives and implementation planning, a resident of the <br />Sevenmile Plaza expressed the desire to conserve the pier from the old Sevenmile Plaza Bridge, <br />which currently comprises a portion of the McDD diversion. As such, NRCS considered keeping <br />the pier in place to serve as part of the new diversion. However, it was determined that, because <br />the footer and bed material beneath the pier are unknown, it was too risky to tie the new <br />diversion into the pier and impossible to ensure the structure would be stable. To honor the <br />sentiment of this historic piece of the Sevenmile Plaza, the stakeholders proposed installing a <br />sign or plaque once the new diversion is in place. <br />Figure 12. Old SevenmFle Plaza Bridge Pier; Currently Part of the McDonald Ditch Diversion <br />20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.