My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150364 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150364 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2015 3:33:34 PM
Creation date
1/10/2014 4:00:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-047
C150364
Contractor Name
Huerfano County Water Conservation District
Contract Type
Loan
Water District
67
County
Huerfano
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 3—CWCB's AUTHORITY <br /> Construction Fund: This loan is made pursuant to the provisions of §§ 37-60-119 <br /> and 37-60-120, C.R.S., which authorize the CWCB to loan money for water projects <br /> from the CWCB Construction Fund for the benefit of the people of the state, provided <br /> that the BORROWER assures repayment of that money. <br /> Section 37-60-122(1)(b), C.R.S., authorizes the CWCB to make loans of up to <br /> $10,000,000 from the CWCB's Construction Fund and the Severance Tax Fund <br /> Perpetual Base Fund without prior approval from the General Assembly. <br /> SECTION 4-BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION <br /> At its September, 2013 meeting, the CWCB approved a Small Project Loan from the <br /> Construction Fund to the BORROWER in an amount up to $2,200,000 for PROJECT <br /> COSTS, with $22,000 for the loan origination fee of 1% in accordance with CWCB <br /> Policy No. 16, resulting in a total loan amount of$2,222,000 at a low income municipal <br /> interest rate of 2.25% per annum for a repayment term of 30 years. <br /> SECTION 5—SCHEDULE OF EXISTING DEBT <br /> No existing debt backed by mill levy revenues. <br /> SECTION 6—ADDITIONAL CONDITIONS&CONTRACT REQUIREMENTS <br /> If the District sells, conveys, assigns, transfers, or otherwise disposes of any portion <br /> of land purchased with CWCB funds from this loan, proceeds from such transfer <br /> shall be applied to the CWCB debt service within 90 days of the sale. In the event of <br /> such sale or transfer and the proceeds not applied to this CWCB debt, the CWCB <br /> may declare all outstanding principal and interest immediately due and payable. <br /> SECTION 7—CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. Engineering contracts, plans and specifications must be submitted to the CWCB <br /> staff for verification of compliance with the terms of this CONTRACT when available <br /> prior to bidding. Any modifications to the plans and specifications must be <br /> approved in writing by the CWCB staff. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br /> by § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br /> State Engineer's Office prior to construction. <br /> D. The District shall extend an invitation to CWCB to be present at the bid opening. <br /> E. The BORROWER shall contract for the construction of the work with responsible and <br /> Appendix 1 to Loan Contract C150364 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.