My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150364 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150364 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2015 3:33:34 PM
Creation date
1/10/2014 4:00:22 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-047
C150364
Contractor Name
Huerfano County Water Conservation District
Contract Type
Loan
Water District
67
County
Huerfano
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Summary — Huerfano County Water Conservancy District <br /> Contract No. C150364 <br /> SECTION 1 —BORROWER INFORMATION <br /> Name: Huerfano County Water Conservancy District <br /> Address: P.O. Box 442, La Veta, Colorado, 80155 <br /> Contact: Michael (Sandy) White, Director <br /> Phone Number: 719-742-6164 <br /> E-mail address: sandy@white-jankowski.com or cdunn @cad-1.com <br /> Type of Entity: The Huerfano County Water Conservancy District, <br /> located in Huerfano County, is a water conservancy <br /> district formed pursuant to and governed by Article 45.1, <br /> Title 37 C.R.S. <br /> SECTION 2—PROJECT DESCRIPTION <br /> A. Description of PROJECT: The BORROWER requested a loan, from CWCB, for the <br /> Regional Augmentation Project. The purpose of the PROJECT is to replace <br /> depletions of wells in unincorporated communities in Huerfano County through a <br /> regional augmentation program. This will include the purchase of the Camp <br /> Ranch and associated water rights, construction of the Red Wing augmentation <br /> reservoir, construction of the Camp Ranch recharge facility, and modifications to <br /> the Mapes Well No. 1 to convert it from a production well for use as a re-timing <br /> well to provide augmentation water directly to the Huerfano River. The total <br /> Project cost is estimated to be $3,050,000. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br /> dated July 2013 on the PROJECT, entitled "Loan Feasibility Study for Huerfano <br /> County Regional Augmentation Project,"which was prepared by Tom Dea, P.E., of <br /> TZA Water Engineers, Inc. and is incorporated herein by reference. Based upon <br /> the feasibility report, the CWCB determined the PROJECT to be technically and <br /> financially feasible. <br /> C. The BORROWER held an election in November 2012, whereby the District <br /> received voter approval to increase the mill levy from 0.128 mills to 2.128 mills. <br /> Based upon the 2012 assessed valuation, this will generate approximately <br /> $243,600 in annual tax revenues. The District also received voter approval to <br /> borrow up to $3 million dollars for the purposes of acquiring and developing <br /> water rights and water storage facilities and to develop a regional augmentation <br /> plan to benefit the water users of Huerfano County. The election results are <br /> evidenced by the BORROWER'S Official Ballot and Official Election Results, which <br /> are incorporated herein by reference. <br /> D. In November, 2013 the District held an election and received voter approval to <br /> increase its 15 year debt service limit to a 30 year debt service limit. The election <br /> results are evidenced by the BORROWER'S Official Ballot and Official Election <br /> Results, which are incorporated herein by reference. <br /> Appendix 1 to Loan Contract C150364 <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.