My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150366 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150366 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:08:10 PM
Creation date
12/13/2013 3:16:11 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-057
C150366
Contractor Name
Windsor, Town of
Contract Type
Loan
Water District
4
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Disadvantages <br />The pre-existing lateral ditch and Greeley No. 2 Canal headgate are not deemed <br />adequate to convey the additional volume required to fill the reservoir and will <br />need to be replaced and enlarged. <br />There may be at least one other user along the path of thelateral ditch and <br />additional carriage capacity will need to be considered to meet these demands. <br />There may be floodplain/floodway issues due to the proximity to the river. <br />Selected Storage Alternative <br />KygerReservoir was the selected alternative due to the many advantages of this <br />storage site. From a water rights standpoint, the site is ideally located for a river <br />exchange of water from Kern Reservoir. It is also ideally located for an exchange of <br />water from future reusable effluent from the Town’s WWTP. Additionally, storage at this <br />location would allow the Town to more fully utilize its eight New Cache shares. This <br />location is ideal for augmentation of the Town’s well pumping and pumping of Weld <br />County School District RE-4’s (WCSD) wells. The Town has an IGA with WCSD, which <br />assists WCSD with augmentation. <br />Windsor hired Leonard Rice Engineers, Inc. to complete a feasibility study on the Kyger <br />Storage Infrastructureas included in the attached Memorandum dated May 30, 2013. <br />This study outlines the water delivery and river return options for Kyger Reservoir and <br />provides a detailed cost estimate for construction of such infrastructure. <br />Non-Potable Water Supply Alternatives <br />The Town is targeting 172 acre-feet of senior water supplies to place into Kyger <br />storage, which is approximately 17% of the estimated capacity of the reservoir. There <br />are many factors that will ultimately govern which water rights will make up this 172 <br />acre-feet of water including seniority, location and ability to divert into the Kyger Pit, <br />availability of the water right, etc. With these factors in mind, we examine the following <br />water rights and irrigation systems in the vicinity of the Town and selectedKyger <br />storage: <br />New Cache la Poudre Irrigating Company and Cache la Poudre Reservoir <br />Company <br />Lake Canal and Lake Canal Reservoir Company <br />Whitney Irrigating Ditch Company <br />B.H. Eaton Ditch Company <br />Box Elder Ditch Company <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.