My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150365 Application
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150365 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 8:54:51 AM
Creation date
10/9/2013 8:17:30 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150365
CT2015-006
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Water District
20
County
Hinsdale
Mineral
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Water Project Loan Application <br />If YES, please explain. <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attorney(s). <br />NAME ADDRESS and PHONE <br />URS CORPORATION 8181 East Tuffs Avenue, Denver CO 80237 <br />Ed A. Toms, P.E (303- 694 -2770) <br />Carlson, Hammond, & Paddock, LLC 1900 Grant Street Suite #1200 Denver, CO 80203 <br />Bill Paddock, Esq. (303- 861 -9000) <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. If so, submit one copy of the study with this application <br />The Feasibility Report for this application has been hand delivered by Engineer Ed. Toms, of <br />URS Corporation, in both paper and electronic form. In addition, a previous loan application <br />was submitted to CWCB on October 26, 2012 for the purpose of pre - qualifying SMR for the <br />entire multi -phase Rehabilitation Study. Accompanying the application SMR submitted two <br />CD ROM disks containing the above studies. <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br />Summary of Project Costs <br />Item <br />Description <br />Cost <br />1 <br />Continental Dam Improvements <br />$3,200,000 <br />2 <br />Construction Contingency (120) <br />$384,000 <br />Total Construction Cost <br />$3,584,000 <br />5 <br />Construction Engineering <br />Support (120) <br />$430,080 <br />Subtotal <br />$4,014,080 <br />6 <br />Admin and Legal (1 %) <br />$40,141 <br />TOTAL PROJECT COST <br />$4,054,221 <br />TOTAL PROJECT COST (ROUNDED) <br />$4,055,000 <br />Project costs are based on 2013 dollars and costs <br />should be reevaluated if the Project is bid after <br />2014. <br />10. Loan amount and terms you are requesting. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.