My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150365 Application
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150365 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 8:54:51 AM
Creation date
10/9/2013 8:17:30 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150365
CT2015-006
Contractor Name
Santa Maria Reservoir Company
Contract Type
Loan
Water District
20
County
Hinsdale
Mineral
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Water Project Loan Application <br />For existing facilities indicate: <br />Number of shareholders 250 or Number of customers served <br />Current Assessment per share $ 28.00 <br />Number of acres irrigated 70,000 <br />Number of shares 5,400 <br />Water Right: A stora e ri ght <br />Average water diverted per year: 1.00 AF per share <br />Part B. - Description of the Project <br />1. Name of the Project Continental Dam and Spillway Restoration <br />2. Purpose of this loan application. Check one. <br />X <br />New project <br />Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />Other (describe) <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES X NO <br />4. General location of the project. (Please include county, and approximate distance and direction <br />from nearest town, as well as legal description, if known. <br />The Project lies within both Hinsdale and Mineral Counties about 23 miles southwest of the town <br />of Creede. Legal Description of the Project Area: The inlet ditch to Santa Maria Reservoir from <br />North Clear Creek diverts from North Clear Creek about 5,398 feet from the SE 1/4 of Section 1, <br />Township 41 North, Range 3 West, N.M.P.M.. Continental Reservoir is located in Section 21, 28, <br />and 29 of the Township 42 North, Range 3 West of the N.M.P.M.., with its outlet works located in <br />the SW 1/4 of Section 21, Township 42 North, Range 3 West, N.M.P.M in Hinsdale County, at a <br />point whence the SW corner is said Section 21 bears approximately South 84° West a distance of <br />1,500 feet. <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br />(See Attached Sheet) <br />6. Will the acquisition of additional water rights be necessary? YES NO X <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.