My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150367 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150367 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2024 4:43:23 PM
Creation date
10/9/2013 8:01:30 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-007
C150367
Contractor Name
Lamar, City of
Contract Type
Loan
Water District
67
County
Prowers
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IMPACTS <br />Construction of the raw water pipeline and it's laterals may have temporary direct impacts from <br />facility construction. Secondary and cumulative impacts from future development within the <br />service area are not anticipated from this project since the project does not increase flow or <br />increase demand. Secondary impacts are those induced or stimulated by, or as a result of, the <br />proposed action. Cumulative impacts can result from individually minor but collectively <br />significant actions taking place over a period of time. From the characteristics of the proposed <br />project, and descriptive elements of the environmental setting, probable impacts are temporary <br />and direct. <br />Unavoidable adverse impacts of all construction and development related projects that may not <br />be fully mitigated include: <br />• Short -term increases in noise and ambient air particulate levels in the immediate vicinity <br />of construction activities. <br />• Commitment of resources including capital, manpower, and materials. <br />All impacts will be considered temporary in nature and therefore there will not be permanent <br />impacts to the manmade and natural environment. <br />INSTITUTIONAL FEASIBILITY <br />Special institutional permits are not anticipated due to the location and characteristics of the <br />work. The raw water transmission line will not require design approval through the Colorado <br />Department of Public Health's (CDPHE) Water Quality Control Division (WQCD). A 404 <br />Nationwide permit will not be required from the U.S. Army Corps of Engineers (COE) because <br />the work will not pass through waters of the United States and dredging and filling activities will <br />not take place within water of the United States. The work does not take place within public <br />lands and not require permitting through the U.S. Bureau of Reclamation (USBR) or U.S. Forest <br />Service (USFS). <br />City of Lamar Raw Water Feasibility Study — Colorado Water Conservation Board 10 <br />