My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150354 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150354 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2015 2:33:10 PM
Creation date
8/20/2013 1:14:21 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-061
C150354
Contractor Name
Grand Mesa Water Conservancy District
Contract Type
Loan
Water District
40
County
Delta
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Section 37- 60- 122(1)(b), C.R.S., authorizes the CWCB to make loans of up to <br />$10,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General <br />Assembly. <br />SECTION 4 - BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED) <br />At its May 14, 2013 meeting, the CWCB approved a Small Project Loan from the <br />Construction Fund to the BORROWER in an amount up to $225,000 for PROJECT costs, <br />with $2,250 for the loan origination fee of 1 % in accordance with CWCB Policy No. 16, <br />resulting in a total loan amount of $227,250 at a blended interest rate of 1.55% per <br />annum for a repayment term of 20 years. <br />SECTION 5 — SCHEDULE OF EXISTING DEBT <br />No existing debt backed by Water Activity Enterprise revenues. <br />SECTION 6 — ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />NONE <br />SECTION 7 — CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br />prepare plans and specifications for the PROJECT. <br />B. Engineering contracts, plans and specifications must be submitted to the CWCB <br />staff for verification of compliance with the terms of this CONTRACT when available <br />prior to bidding. Any modifications to the plans and specifications must be <br />approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br />by § 37 -87 -105 C.R.S., the BORROWER shall provide a letter of approval from the <br />State Engineer's Office prior to construction. <br />D. The District shall extend an invitation to CWCB to be present at the bid opening. <br />E. The BORROWER shall contract for the construction of the work with responsible and <br />capable Construction Firms, which said Construction Firms shall be selected by <br />the BORROWER and found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract <br />documents consisting of the contractor's proposal, construction contract, <br />performance bond, payment bond, notice of award, notice to proceed, sample <br />change order, and sample field order, as well as the advertisement for bid and bid <br />bond at bidding. After the CWCB staff verifies that these documents comply with <br />the terms of this CONTRACT, the BORROWER may issue the notice to proceed to the <br />Construction Firms. <br />Appendix 1 to Loan Contract C150354 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.