My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150360 Feasibilty Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150360 Feasibilty Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2015 8:03:37 AM
Creation date
7/23/2013 10:26:33 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-141
C150360
Contractor Name
East Mesa Water Company
Contract Type
Loan
Water District
38
County
Pitkin
Garfield
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mesa Water Company for the benefit of the shareholders by providing irrigation water from the <br />Crystal River, <br />The East Mesa Ditch has a tunnel that is about 700 feet long that is collapsing as well as a section of <br />ditch that is on a very steep hillside and slides and catches much debris and rock. The East Mesa <br />Water Company wants to install a HDPE plastic pipeline to make a permanent fix of this section. <br />Proposed work will take place in the fall and winter of 2013 while the ditch is not in use. <br />The proposal is to pipe the 1450 ft. to bypass the existing tunnel. The new route will provide a <br />stable base and prevent future lose of use of the water due to ditch and tunnel failure. <br />6. Will the acquisition of additional water rights be necessary? YES NO X <br />If YES, please explain. <br />7. Please list the names, addresses and phone numbers of the Applicants' engineer(s) and <br />attorney(s). <br />NAME ADDRESS and PHONE <br />Mike Kishimoto Engineer, NRCS, 970 - 945 -5494 <br />258 Center Drive <br />Glenwood Springs CO 81601 <br />Attorney: <br />Arthur B. Ferguson Jr. Attorney <br />600 East Main Street, Suite 104 <br />Aspen, CO 81611 <br />970 - 429 -6884 <br />Fax 970 - 840 -9360 <br />8. List any feasibility studies or other investigations that have been completed or are now in <br />progress for the proposed project. Please submit one copy of each completed study with <br />this application. <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if known. <br />Estimated Engineering Costs:$ 10,000.00 <br />Estimated Construction Costs:$ 550,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.