My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150360 Feasibilty Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150360 Feasibilty Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2015 8:03:37 AM
Creation date
7/23/2013 10:26:33 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-141
C150360
Contractor Name
East Mesa Water Company
Contract Type
Loan
Water District
38
County
Pitkin
Garfield
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Please provide a brief description of the owner's existing water supply facilities and <br />describe any existing operational or maintenance problems. Attach separate sheets if needed, <br />and a map of the service area. We have a diversion from Crystal River about 9 miles south <br />of the intersection of highway 82 and 133. The diversion is across the river from Highway <br />133 on the east side of the Crystal River. <br />For existing facilities indicate: <br />(umber of shareholders 12 or Number of customers served 54 <br />urrent Assessment per share $ $15.00 to $18.00 Number of shares 1003 <br />umber of acres irrigated About 780 Water Right: _41.8 CFS. <br />�verage water diverted per year: _ acre -feet. <br />Part B. - Description of the Project <br />1.Name of the project or facility East Mesa Water Company Pipeline <br />2.Purpose of this loan application. Check one. <br />project <br />Rehabilitation or replacement of existing facility <br />of existing facility <br />Repair to replace tunnel. <br />(describe) <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under <br />a storage restriction order from the State Engineer? YES _ NO X_ <br />General location of the project. (Please include county, and approximate distance and direction <br />from nearest town, as well as legal description, if known. Pitkin County, Colorado. <br />Section 3, R 88 W, T 9 S. About 7 miles South of Carbondale, Colorado, On the East side of <br />Crystal River along Highway 133. <br />5.1 Please provide a brief narrative description of the proposed project including purpose, need, <br />f ilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br />of Project: <br />project lies in the Crystal River Valley in the northern portion of Pitkin County and the <br />iern portion of Garfield County, Colorado. The East Mesa Water Company operates the East <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.