My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150516 Contract
CWCB
>
Grants
>
DayForward
>
C150516 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2013 12:09:47 PM
Creation date
7/18/2013 11:36:44 AM
Metadata
Fields
Template:
Grants
Applicant
Santa Maria Reservoir Company
Fiscal Year (i.e. 2008)
2013
Project Name
Santa Maria Siphon & Canal System Rehabilitation
CWCB Section
Finance
Contract/PO #
C150516
Grants - Doc Type
Contract/Purchase Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit A -2 <br />BUDGET <br />Task <br />No. <br />Task Description <br />Total Price <br />1 <br />SUPPORT SYSTEM STABILIZATION <br />Mobilization & Site Prep <br />$16,240 <br />Erosion & Sediment Control <br />$2,240 <br />Clearing & Grubbing <br />$5,600 <br />Demolition of Thrust Blocks <br />$22,400 <br />Demolition of Intermediate Supports <br />$22,400 <br />Reinforced Concrete Overlays - Thrust Blocks <br />$21,840 <br />Reinforced Concrete Overlays - Intermediate Blocks <br />$43,680 <br />Fabrication & Installation - Steel Bearing Plates <br />$5,600 <br />Removal of Loose Rock & Boulders <br />$16,800 <br />Engineering <br />$15,680 <br />Admin <br />$1,340 <br />Environmental permitting <br />$3,750 <br />2 <br />CANAL IMPROVEMENTS <br />Mobilization & Site Prep <br />$133,900 <br />Erosion & Sediment Control <br />$11,200 <br />Dewatering <br />$11,200 <br />Clearing & Grubbing <br />$21,000 <br />Stripping & Stockpiling Topsoil <br />$6,720 <br />Selective Demolition <br />$44,800 <br />42 -inch Bypass pipe <br />$323,900 <br />Concrete Encasement <br />$458,640 <br />Unclassified Excavation <br />$14,800 <br />Rock Excavation <br />$11,400 <br />Fill <br />$6,700 <br />Concrete Canal Liner <br />$398,000 <br />Riprap & Bedding <br />$16,700 <br />Concrete Check Structure <br />$3,600 <br />Reclamation of Disturbed Areas <br />$5,400 <br />Engineering <br />$146,720 <br />Admin <br />$16,500 <br />Environmental permitting <br />$46,250 <br />Total <br />$1,855,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.