My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150349 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150349 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:10:32 PM
Creation date
5/21/2013 9:56:46 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150349
Contractor Name
Ordway Feedyard LLC
Contract Type
Loan
Water District
17
County
Crowley
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
more particularly described in the attached DEED OF TRUST ( "COLLATERAL "). Said COLLATERAL shall <br />be equal in value to 110% of the LOAN AMOUNT as verified by an appraisal. <br />SECTION 7 — ADDITIONAL CONDITIONS & CONTRACT REQUIREMENTS <br />No additional conditions or contract requirements <br />SECTION 8 — CONSTRUCTION FUND PROGRAM PROCEDURES <br />A. The BORROWER shall employ an engineer, registered in the state of Colorado to prepare plans <br />and specifications for the PROJECT. <br />B. Engineering Contracts and the plans and specifications must be submitted to the CWCB staff for <br />verification of compliance with the terms of this CONTRACT when available prior to bidding. Any <br />modifications to the plans and specifications must be approved in writing by the CWCB staff. <br />C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by § 37 -87 -105 <br />C.R.S., the BORROWER shall provide a letter of approval from the State Engineer's Office prior to <br />construction. <br />D. CWCB staff must be invited to bid opening and must approve the award of the construction <br />contract. <br />E. The BORROWER shall contract for the construction of the work with responsible and capable <br />Construction Firms, which said Construction Firms shall be selected by the BORROWER and. <br />found acceptable by the CWCB staff. <br />F. The BORROWER must provide a copy of the executed construction contract documents consisting <br />of the contractor's proposal, construction contract, performance bond, payment bond, notice of <br />award, notice to proceed, sample change order, and sample field order, as well as the <br />advertisement for bid and bid bond at bidding. After the CWCB staff verifies that these <br />documents comply with the terms of this CONTRACT, the BORROWER may issue the notice to <br />proceed to the Construction Firms. <br />G. The BORROWER shall conduct a pre- construction conference at which time the CWCB staff shall <br />have the opportunity to review and approve the construction schedule. <br />H. If the CWCB staff determines that the PROJECT requires a resident inspector during construction, <br />the BORROWER shall employ an inspector who has been approved by the CWCB staff. <br />1. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br />specifications. <br />J. Upon completion of the PROJECT construction, the BORROWER shall provide as -built drawings of <br />the PROJECT to the CWCB staff, or, if required by § 37 -87 -105, C.R.S., the BORROWER shall <br />provide the as -built drawings to the State Engineer's Office for approval and filing. <br />K. Upon completion of the PROJECT construction, the BORROWER shall arrange a final inspection for <br />the CWCB staff. <br />L. The BORROWER shall pay all of the expenses related to the PROJECT when such bills are due. <br />Appendix 1 to Loan Contract C150349 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.