My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150349 Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150349 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 3:10:32 PM
Creation date
5/21/2013 9:56:46 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150349
Contractor Name
Ordway Feedyard LLC
Contract Type
Loan
Water District
17
County
Crowley
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT SUMMARY — Ordway Feedyard, LLC - Contract No. C150349 <br />SECTION 1 — BORROWER INFORMATION <br />Name: Ordway Feedyard, LLC. <br />Address: 19424 Colorado Hwy 96, Ordway, CO 81063 <br />Contact: Tyler Karney, Resident Manager <br />Phone Number: 719 - 267 -3551 <br />E -mail address: tyler @ordwayfeedyard.com <br />Type of Entity: Colorado limited liability company <br />Section 2 — Project Description <br />A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be used for the <br />construction of the Ordway Feedyard Raw Water Line Extension, consisting of rehabilitation <br />the existing ranch irrigation system and installing additional pipeline and a booster pump <br />station to deliver well water from the River Ranch to the Feedyard, located in Crowley County, <br />hereinafter referred to as the PROJECT, at an estimated total PROJECT cost of $3,381,500. <br />B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report on the <br />PROJECT entitled "Feasibility Study- Ordway Feedyard, LLC," dated January 2013, compiled by <br />Elise M. Bergsten, from Balances Management Services Company, Colorado Springs, with <br />support from Tyler Karney, Resident Manager for the Ordway Feedlot, which is incorporated <br />herein by reference and based upon this feasibility report, the CWCB determined the PROJECT to <br />be technically and financially feasible. <br />SECTION 3 — CWCB'S AUTHORITY <br />Construction Fund: This loan is made pursuant to the provisions of §§ 37 -60 -119 and 37 -60 -120, <br />C.R.S., which authorize the CWCB to loan money for water projects from the CWCB Construction <br />Fund for the benefit of the people of the state, provided that the borrower assures repayment of that <br />money. <br />Section 37- 60- 122(1)(b), C.R.S., authorizes the CWCB to make loans of up to $10,000,000 from <br />the CWCB's Construction Fund and the State Severance Tax Trust Fund Perpetual Base Account <br />Fund without prior approval from the General Assembly. <br />SECTION 4 - BOARD APPROVAL <br />At its March 19, 2013 meeting, the CWCB approved a Small Project Loan from the Construction Fund to <br />the BORROWER in an amount up to $2,500,000 for PROJECT costs with $25,000 for the loan origination fee <br />of 1 % of the cost of the PROJECT, resulting in a total loan amount of $2,525,000 with an interest rate of <br />1.75% per annum for a repayment term of 30 years. This is in accordance with CWCB Policy No. 16. <br />SECTION 5 — SCHEDULE OF EXISTING DEBT <br />None <br />SECTION 6 - COLLATERAL <br />The COLLATERAL provided for this loan, as evidenced by the executed DEED OF TRUST, in the form <br />attached as APPENDIX 5 and incorporated herein, shall be an undivided interest in real property as <br />Appendix 1 to Loan Contract C150349 <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.