Laserfiche WebLink
dam structure will be removed and 57odip" an sane and s keyway installed in the base, but springs or <br />unstable areas are foreseen. Any additional material for the embanlonicat will be provided from the existing <br />material that was stockpiled in the !tom Park Area on the USFS facility. <br />The District expects the work to begin in clearing and grubbing the aocess into the reservoir site as soon as <br />the roads in the USFS area are passable after the spring runoff <br />A brief tentative schedule for the reconstruction of the Blanche Part Reservoir is as follows: <br />Summer 2013 <br />1. Use existing contractor form Peak Reservoir becarrse of familiarity of all the agencies and the <br />project. (Assume that the site is accessible by July 1 2013) <br />2. Survey the access alignment with coM information an the construction of the project and walk <br />the alignment with USFS persoand (2 weeks) <br />3. Tree inventory before starting con struc ti m (3 weeks) <br />4. Tree removal and access construction ( 3 weeks) <br />5. Remove existing dam material and stockpile. (3 weeks) <br />6. Construct key way and have Dam Safety inspection for base acceptability (2 weeks) <br />7. Embarkment placement dt of outlet pipe. (6 weeks) <br />8. Close down project for winter (November 1, 2013 <br />Summer 2014 <br />1. Install emergency overflow, outlet gate worts, and reseed. (4 weeks) <br />2. Start removing construction road and reduce size to an 8 ft wide for an access road (4 weeks) <br />3. Reseed (1 week) <br />4. Provide as4m»lt survey of dam embankmest to Division of Water Resources (3 weeks) <br />5. Receive approval for storage of water. <br />Winter 2014 -2015 store water <br />