Laserfiche WebLink
Aug -15 -01 12:29P TIMOTHY R. BUCHANAN 3033 -7266 P.04 <br />Mr. James A. Ferentchak, P.E. <br />August 10, 2001 <br />Page 2 <br />Please submit "A" Constructce mylar drawings, including the original certification sheet and one set <br />of blueline drawings, upon completion of construction. Final acceptance of the construction will be contingent <br />upon our receipt and acceptance of the "As- Constructed" drawings, as well as the other requirements of Rule 10 <br />(copy enclosed) of the Rules and Regulations. It should be noted that as part of the construction completion <br />documents, an updated Emergency Preparedness Plan (EPP) is required. If you have any questions concerning <br />the filing of "As-Constructed" drawings or any other completion document, please contact Mr. Jackson. <br />We look forward to working with you on this construction project and to achieving a successful <br />completion of the proposed repairs to the dam. <br />Sincerely, <br />(� 7 <br />ack G. Byers, P. <br />Assistant State Engineer <br />Enclosures: Copies of Rule 9, 10 and 16 of the "Rules and Regulations for Dam Safety and Darn Constriction ". <br />cc: Dick Stenzel, Division Engineer (w /o enclosures) <br />Garrett Jackson, Dam Safety Engineer (w/ approved plans and specifications only) <br />Jim Dubler, Dam Safety Engineer (w/ approved plans and specifications only) <br />Edward Fritzler, President, Jackson Lake Reservoir and Irrigation Company (w /o enclosures) <br />