Laserfiche WebLink
Ridges Basin Contents - 400 cfs Supply Scenario <br />2 -Month Pumping Preference <br />Rol "'Ifflar NO <br />KIM <br />old <br />Switched to Yea <br />r Round in 1977 <br />Resume 2_month pumping in 1983 <br />> <br />4 <br />0 <br />Switch to Year Round 1" 2001 <br />Resume 2-month pumping In 200 <br />-Year Round Pumping -May -June Pumping Only •••••• Inactive Pool May -June Pumping then Year -Round at 60,000 AF <br />Analysis: 400 cfs water tdiversion limit. with 2 -month pumping preference. When the reservoir Formatted: Font: Bold <br />level drops to near 60,000 acre -feet, allow year -round pumping until the reservoir significantly recovers <br />(above 100,000 acre -feet) <br />Observations' Formatted: Font: Bold <br />• With a 400 cfs diversion limit. the content is below the dead pool level only 2 months <br />(winter months) in the analysis period with the 2 -month pumping preference then year -round <br />when level drops to near 60,000 acre -feet. Full project demands can be met. <br />• With a 400 cfs •tdiversion limit, a 2 -month pumping cycle can occur 70 percent of the <br />time. 30 percent of analysis years would require year -round pumping. <br />• Reservoir takes longer to recover to full than 450 cfs scenario after 1.989 because no year -round <br />umoina and lower total diversion rate. <br />