My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Animas- La Plata Environmental Impact Statement
CWCB
>
ALP Project
>
Animas- La Plata Environmental Impact Statement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/26/2013 8:57:16 AM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
a <br />0 <br />Ridges Basin Contents - 450 cfs Supply Scenario <br />2 -Month Pumping Preference <br />Year -Round Pumping - May -June Pumping Only - May -June Pumping then Year -Round at 60,000 AF ..... Inactive Pool <br />Analysis: 450 cfs waleF— Aghtdiversion limit, with 2 -month pumping preference. When the reservoir Formatted: Font: Bold <br />level drops to near 60,000 acre -feet, allow year -round pumping until the reservoir significantly recovers <br />(above 100,000 acre -feet) <br />"ttle ampai#_ This w-c beca-61se when FeseFVG*F is GIFIGIpping, available FiveF water is FAWFAM <br />Observations: -- -- <br />• With a 450 cfs wateF Fegkttdiversion limit, the content is below the dead pool level only 1 month <br />(March) in the analysis period with the 2 -month pumping preference then year -round when <br />level drops to near 60,000 acre -feet. Full project demands can be met. <br />• With a 450 cfs wateF F gWiversion limit. a 2 -month pumping cycle can occur 80 percent of the <br />time. 20 percent of analysis years would require year -round pumping. <br />Formatted: Font: Bold, Not Highlight <br />Formatted: Font: Boll <br />Switched to Year Round in 1977 ' <br />rrrr <br />Ink � 1�1 <br />Year -Round Pumping - May -June Pumping Only - May -June Pumping then Year -Round at 60,000 AF ..... Inactive Pool <br />Analysis: 450 cfs waleF— Aghtdiversion limit, with 2 -month pumping preference. When the reservoir Formatted: Font: Bold <br />level drops to near 60,000 acre -feet, allow year -round pumping until the reservoir significantly recovers <br />(above 100,000 acre -feet) <br />"ttle ampai#_ This w-c beca-61se when FeseFVG*F is GIFIGIpping, available FiveF water is FAWFAM <br />Observations: -- -- <br />• With a 450 cfs wateF Fegkttdiversion limit, the content is below the dead pool level only 1 month <br />(March) in the analysis period with the 2 -month pumping preference then year -round when <br />level drops to near 60,000 acre -feet. Full project demands can be met. <br />• With a 450 cfs wateF F gWiversion limit. a 2 -month pumping cycle can occur 80 percent of the <br />time. 20 percent of analysis years would require year -round pumping. <br />Formatted: Font: Bold, Not Highlight <br />Formatted: Font: Boll <br />
The URL can be used to link to this page
Your browser does not support the video tag.