My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 21
CWCB
>
ALP Project
>
ALP 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 1:15:16 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project: ALP O &M TRANSFER ISSUE Task _ _ _ _ Milestone ® Rolled Up Task Rolled Up Progress External Tasks — - -- - -- -- Group By Summary <br />Date: Sun 3/4/12 Progress Summa ry Rolled U p Milestone Split <br />Project Summary Deadline <br />Page 5 <br />ALL ITEMS - ALP TRANSFER ISSUES SCHEDULE 1 <br />-5 -12 UPDATE: 52.2% COMPLETE <br />ID <br />0 <br />Task Name <br />Start <br />Finish Jan '10 Feb'10 <br />Mar'10 Apr'10 May'10 Jun '10 Jul'10 Aug'10 <br />27 3 10 17 24 31 7 <br />14 21 28 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 <br />213 <br />�% <br />Stairw ell Electrical Boxes Need Covers <br />Wed 1/4/12 <br />Fri 1/6/12 <br />214 <br />�% <br />Seal Wireway in Elevator Room <br />Thu 10/20/11 <br />Thu 10/20/11 <br />215 <br />v <br />Ventilation Needed on Elevator Control Cabinet <br />Fri 2/17/12 <br />Fri 2/24/12 <br />216 <br />Fire Alarm Strobe (east side) is Broken <br />Fri 3/30/12 <br />Fri 3/30/12 <br />217 <br />3 <br />Exterior Lights are Staining the Building Finish <br />Fri 3/30/12 <br />Fri 3/30/12 <br />218 <br />.% <br />EIFS Siding is Damaged in Several Places <br />Fri 10/1/10 <br />Mon 8/15/11 <br />EIFS Siding is <br />219 <br />�j <br />Cover on Electrical Outlet Damaged <br />Wed 2/29/12 <br />Wed 2/29/12 <br />220 <br />.% <br />Lower Flashing on Lower Roof is Damaged <br />Mon 8/22/11 <br />Fri 8/26/11 <br />221 <br />Dead Trees on East Side of Building <br />Mon 8/22/11 <br />Thu 8/25/11 <br />222 <br />Electrical Pullbox is Damaged <br />Mon 8/22/11 <br />Mon 8/22/11 <br />223 <br />EIFS Colors Do Not Match <br />Mon 4/9/12 <br />Fri 4/13/12 <br />224 <br />Four Dead Trees at North End of Building <br />Mon 8/22/11 <br />Thu 8/25/11 <br />225 <br />�j <br />North and West Entry Door Stick Intermittently <br />Wed 1/4/12 <br />Wed 1/4/12 <br />226 <br />�j <br />Electrical Receptacle Missing Cover <br />Tue 1/31/12 <br />Tue 1/31/12 <br />227 <br />V <br />Louvers Paint Does Not Match <br />Mon 3/26/12 <br />Fri 3/30/12 <br />228 <br />�j <br />Roof Expansion Joint (vertical riser) is Damaged <br />Mon 8/22/11 <br />Mon 8/22/11 <br />229 <br />Electrical LB Unknown Destination /Origin (west side) <br />Mon 8/22/11 <br />Mon 8/22/11 <br />230 <br />EIFS Damage on West Side of building <br />Fri 10/1/10 <br />Mon 8/15/11 <br />EIFS Dama <br />231 <br />74 <br />Air Conditioner has Bent Evaporator Coil fins <br />Wed 2/29/12 <br />Wed 2/29/12 <br />232 <br />7.q <br />Top of Air Conditioner is Damaged (bent downward) <br />Tue 4/17/12 <br />Wed 4/18/12 <br />233 <br />Boiler Exhaust Pipes are Damaged <br />Tue 2/28/12 <br />Wed 2/29/12 <br />234 <br />�j <br />Replace damaged fire alarm strobe on east exterior side of building <br />Thu 2/9/12 <br />Thu 2/9112 <br />235 <br />3 v <br />RBIC Air Piping - new condensate dump needed with heat trace <br />Thu 3/1/12 <br />Thu 3/15/12 <br />236 <br />Oil Cooler Needs Protective Cover <br />Mon 7/18/11 <br />Fri 7/22/11 <br />237 <br />Concrete Slab at Compressor is Settling <br />Mon 7/9/12 <br />Fri 7/13/12 <br />238 <br />Asphalt is Settling North of Compressor <br />Mon 7/9/12 <br />Fri 7/13/12 <br />239 <br />Access Door Threshold at Air Chamber has Damaged Concrete <br />Fri 3/30/12 <br />Fri 3/30/12 <br />240 <br />CP Test Station Box not Secured to Wall (air chamber) <br />Mon 2/6/12 <br />Mon 2/6/12 <br />241 <br />V <br />Adjust Seal at Service Bay Overhead Door <br />Fri 4/27/12 <br />Mon 4/30/12 <br />242 <br />Canopy Should Read "A -LP ", not "Durango ", Needs Installed <br />Mon 8/22/11 <br />Fri 9/2/11 <br />243 <br />�j <br />CoD Air Chamber Compressor need Shelter <br />Mon 7/18/11 <br />Fri 7/22/11 <br />244 <br />Durango Pumping Plant Design Issues <br />Mon 8/2/10 <br />Fri 8/31/12 <br />Durango Pumping Plant Design Issues 4245 <br />�j v <br />Mech. Seal Water System <br />Fri 10/1/10 <br />Wed 6/29/11 <br />246 <br />3 V <br />Install wall mounted jib crane to access #8 Suction Valve <br />Mon 6/25/12 <br />Fri 6/29/12 <br />247 <br />V <br />Outer door for EG Rollup Door <br />Mon 6/11/12 <br />Fri 6/22/12 <br />248 <br />Remove all Fire Hoses <br />Mon 8/2/10 <br />Mon 8/2/10 <br />Remove all Fire Hoses <br />249 <br />Repair Ice Damage, Cover Compressors <br />Fri 10/1/10 <br />Mon 8/1/11 <br />Repair Ice D <br />250 <br />�j <br />Wire Permissives to Small Units <br />Mon 6/25/12 <br />Fri 6/29/12 <br />251 <br />fv <br />Master Flowmeter for Mech Seal <br />Fri 10/1/10 <br />Fri 10/1/10 <br />Mast <br />252 <br />V <br />Units Labeled with Unit # <br />Mon 8/2/10 <br />Mon 8/2/10 <br />Units Labeled with Unit # <br />253 <br />f V <br />Pump cavitation (DUPLICATE) <br />Fri 10/1/10 <br />Tue 3/1/11 <br />Pu <br />254 <br />!0 V <br />Unit Bay Crane Access <br />Mon 4/16/12 <br />Fri 8/31/12 <br />255 <br />,V <br />Code Call System <br />Mon 8/2/10 <br />Fri 8/13/10 <br />Code Call System <br />256 <br />Orifice Plate Embedded in Concrete <br />Mon 4/23/12 <br />Fri 4/27/12 <br />257 <br />Remount Guard Valve Operators <br />Wed 7/11/12 <br />Tue 7/31/12 <br />258 <br />�j V <br />Check Valve in COD Pit Wrong Direction <br />Thu 10/20/11 <br />Fri 11/18/11 <br />259 <br />,� j v <br />Enclose COD Compressor, Paint (DUPLICATE) <br />Mon 8/2/10 <br />Fri 8/6/10 <br />Enclose COD Compressor, Paint (DUPLICATE) <br />260 <br />Ridges Basin Dam Items <br />Mon 8/2/10 <br />Tue 7/31/12 <br />Ridges Basin Dam Items <br />261 <br />Pipe Leak @ Section 8/9, 14/15 <br />Mon 3/26/12 <br />Fri 3/30/12 <br />262 <br />Repair corroded duct work on the ventilation system in the tunnel <br />Fri 4/20/12 <br />Thu 5/31/12 <br />263 <br />P2P Testing, and Wiring Diagrams (DUPLICATE) <br />Wed 2/1/12 <br />Wed 2/29/12 <br />264 <br />Correct all Tags, Verify BOM <br />Wed 2/1/12 <br />Wed 2/29/12 <br />265 <br />�j V <br />MCC Meter, Disconnect Shaft <br />Wed 11/16/11 <br />Fri 11/18/11 <br />Project: ALP O &M TRANSFER ISSUE Task _ _ _ _ Milestone ® Rolled Up Task Rolled Up Progress External Tasks — - -- - -- -- Group By Summary <br />Date: Sun 3/4/12 Progress Summa ry Rolled U p Milestone Split <br />Project Summary Deadline <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.