Laserfiche WebLink
Project: ALP O &M TRANSFER ISSUE <br />Task _ Milestone O Rolled Up Task Rolled Up Progress External Tasks C _ _ -] Group By Summary <br />- - <br />Date: Sun 3/4/12 Progress Summary Rolled Up Milestone O Split Project Summary 0- -- - --0 Deadline O <br />Page 4 <br />ALL ITEMS <br />- ALP TRANSFER ISSUES SCHEDULE 1 -5 -12 <br />UPDATE: 52.2% COMPLETE <br />ID <br />Task Name <br />Start <br />Finish Jan '10 Feb'10 <br />Mar'l0 Apr'10 May'l0 Jun '10 Jul'10 Aug'10 <br />0 <br />27 3 10 17 24 31 7 14 <br />21 28 7 14 21 28 4 11 _ 18 _25 2_ _9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 <br />160 <br />Sweep has Hoofman Box and Square D Disconnect, ensure Compatibility <br />Mon 8/22/11 <br />Mon 8/22/11 <br />161 <br />V <br />Fan Needs Guarding <br />Mon 3/19/12 <br />Fri 4/27/12 <br />162 <br />�% <br />EMT Conduit Used for SCADA, all Other is Rigid <br />Mon 8/22/11 <br />Wed 8/24/11 <br />163 <br />West Side of Building has Failed Caulk <br />Fri 3/30/12 <br />Fri 3/30/12 <br />164 <br />'74 <br />Order staff gauge with angle required for side of intake at trash racks <br />Mon 2/13/12 <br />Wed 2/15/12 <br />Thu 3/1/12 <br />Fri 3/2/12. <br />166 <br />3 V <br />Complete HVAC @ Control House <br />Wed <br />167 <br />f V <br />Replace Sweep Motor Flange <br />Tue 3/1/11 <br />Tue 3/15/11 <br />168 <br />�j V <br />Ensure Pressure Switch on Compressor is Correct <br />Mon 1/23/12 <br />Thu 1/26/12 <br />169 <br />V <br />Repair /Store Bulkhead Gates <br />Mon 5/28/12 <br />Fri 9/28/12 <br />170 <br />�j V <br />Fix Handrail Wobble @ Intake <br />Mon 8/2/10 <br />Fri 8/6/10 <br />Fix Handrail Wobble @ Intake S <br />171 <br />V <br />Relocate Fish Screen differential Meter (DUPLICATE) <br />Mon 8/2/10 <br />Fri 8/6/10 <br />Relocate Fish Screen differential Meter (DUPLICATE) <br />172 <br />�j v <br />Adjust Screen Baffles <br />Mon 8/2/10 <br />Fri 8/6/10 <br />Adjust Screen Baffles <br />173 <br />3 V <br />Install permanent brackets on Fish Screen Drive Unit Grease Pipe <br />Mon 6/25/12 <br />Fri 6/29/12 <br />174 <br />_j. <br />Trolley cable is Frayed <br />Mon 5/28/12 <br />Thu 5/31/12 <br />175 <br />74 <br />Remedy the Heat Tape Installation on Limit Switches <br />Wed 3/14/12 <br />Fri 3/16/12 <br />176 <br />3 V <br />I -Beam for Trolley Showing Excessive Wear <br />Mon 5/21/12 <br />Fri 5/25/12 <br />177 <br />74 s; <br />Permanately Mount the Ring Bouys <br />Fri 3/30/12 <br />Thu 4/26/12 <br />178 <br />f <br />Remove all Silt fence around Intake Structure <br />Mon 11/7/11 <br />Tue 11/8/11 <br />179 <br />—4 <br />Install UV Protection for Seal on Bulkheads <br />Thu 3/29/12 <br />Thu 3/29/12 <br />180 <br />Replace Frayed Cable on Bulkhead Rigging <br />Thu 3/29/12 <br />Fri 3/30/12 <br />181 <br />�j V <br />Drainage Ditch Leaves Excessive Dirt at Steps to DPP <br />Mon 8/2/10 <br />Fri 8/6/10 <br />Drainage Ditch Leaves Excessive Dirt at Steps DPP <br />182 <br />Intake Structure /Control House Design Issues <br />Mon 812/10 <br />Tue 9/25/12 <br />Intake Structure /Control House Design Issues <br />183 <br />V <br />Redesign Obermeyer Gates <br />Mon 3/5/12 <br />Thu 5/31/12 <br />184 <br />V <br />Resolve Silt Buildup Issue in Forebay <br />Wed 7/4/12 <br />Tue 7/31/12 <br />185 <br />3 v <br />Redesign Sweep Trolley Bearings <br />Mon 3/19/12 <br />Fri 3/30/12 <br />186 <br />V <br />Design Method to Clean Screen While Operating <br />Wed 6/1/11 <br />Tue 7/26/11 <br />187 <br />- V <br />Provide Trash Rake <br />Wed 8/1/12 <br />Tue 9/25/12 <br />188 <br />�j V <br />Repair /Replace Bulkhead Guides <br />Mon 8/2/10 <br />Fri 1/14/11 <br />Repair /Replace Bulkhead Guides <br />189 <br />V <br />Install Fixed Laddders Both Sides of Screen <br />Fri 5/25/12 <br />Thu 5/31/12 <br />190 <br />—4 <br />Install Filling Valve on Bulkhead Gate <br />Thu 8/30/12 <br />Fri 8/31/12 <br />191 <br />6461 Elevation <br />Fri 10/1/10 <br />Fri 7/13/12 <br />192 <br />—4 <br />Fix Roll -up Door on E -G Room <br />Mon 1/9/12 <br />Fri 3/30/12 <br />193 <br />`> <br />Corrosion on CoD Air Compressor <br />Mon 2/13/12 <br />Tue 2/14/12 <br />194 <br />—4 <br />Install electrical cover on box in E -G room <br />Thu 3/22/12 <br />Thu 3/22/12 <br />195 <br />Replace Boiler fix Gas Leak <br />Mon 5/16/11 <br />Thu 5/19/11 <br />196 <br />V <br />Boiler Jumpers Removed Pump Fixed <br />Mon 5/16/11 <br />Thu 5/19/11 <br />197 <br />�j <br />Oil Leak on Air Chamber Compressor <br />Fri 6/3/11 <br />Thu 6/9/11 <br />198 <br />f <br />Water on Floor of Air Chamber by ladder <br />Fri 10/1/10 <br />Mon 10/11/10 <br />Water on Flo <br />199 <br />Entry Door Lockset Damaged <br />Wed 2/29/12 <br />Wed 2/29/12 <br />200 <br />V <br />Lock Cylinders Missing on Workroom Doors <br />Mon 2/27/12 <br />Wed 2/29/12 <br />201 <br />PRV Leaking Water <br />Wed 11/2/11 <br />Tue 11/15/11 <br />202 <br />.% V <br />Remote Water Meter Not Hooked Up <br />Mon 8/22/11 <br />Mon 8/22/11 <br />203 <br />�j <br />OS&Y Valve Tamper Switch Not Working <br />Mon 5/9/11 <br />Tue 5/10/11 <br />204 <br />Mount the Fire Extinguisher <br />Mon 8/22/11 <br />Mon 8/22/11 <br />205 <br />✓ <br />Remove Stored Items form Electrical Panel <br />Mon 6/20/11 <br />Tue 6/21/11 <br />206 <br />V <br />Floor Sealer Need Applied <br />Mon 4/23/12 <br />Fri 4/27/12 <br />207 <br />f <br />Receptacle Near Eye Wash Needs Cover <br />Mon 5/23/11 <br />Mon 5/23/11 <br />208 <br />V <br />Need Service Bay Crane Access <br />Mon 3/19/12 <br />Fri 4/27/12 <br />209 <br />Connect Door Closer Entry Door <br />Mon 2/28/11 <br />Mon 2/28/11 <br />210 <br />'�% <br />Caulk East Entry Door Threshold <br />Wed 1/4/12 <br />Wed 1/4/12 <br />211 <br />.% <br />East Door has Damaged Gasket <br />Mon 9/5/11 <br />Mon 9/5/11 <br />212 <br />�j <br />Elevator Room Fire Extinguisher Needs Mounted <br />Wed 1/18/12 <br />Wed 1/18/12 <br />Project: ALP O &M TRANSFER ISSUE <br />Task _ Milestone O Rolled Up Task Rolled Up Progress External Tasks C _ _ -] Group By Summary <br />- - <br />Date: Sun 3/4/12 Progress Summary Rolled Up Milestone O Split Project Summary 0- -- - --0 Deadline O <br />Page 4 <br />