Laserfiche WebLink
ALL ITEMS <br />- ALP TRANSFER ISSUES SCHEDULE <br />3 -5 -12 UPDATE: 52.2% COMPLETE <br />ID <br />54V <br />V <br />V <br />v <br />3v <br />3v <br />V <br />�j <br />✓ V <br />V <br />3V <br />V <br />V <br />�jU <br />V <br />fV <br />✓ V <br />�j <br />✓ <br />�j <br />�j <br />�j <br />r. V <br />�j <br />f' <br />�j <br />�j <br />�j <br />�j <br />Task Name <br />Verify COD Air Chamber Installation <br />Ventilation for elevator controls (duplicate) <br />Low gas pressure in cameras <br />6418 Elevation <br />Factory Test Reports Pump /Motors <br />Pump /Motor Coupling Baseline Data <br />Shipping Braces for Motor Rotors <br />BaselinglMgel <br />Install SEBs on Pumps <br />Relocate Mech Seal Site Glass <br />Replace all Mechanical Seals where SEB's replaced <br />Seal Strainer Drain <br />B -Flys Differential Pressure issue <br />Oil Leaks on Sump Pumps <br />Oil Leaks on Pumps /Motors <br />Fix Intermittent RTD Problems <br />Repair Pump Coatings and rebuild units <br />Repair INPRO Seal Leaks <br />Repair Mechanical Seal Leaks <br />Cavitation issue <br />Blind flanges, 2 each for each size unit <br />Move Motor Temp. Gages to Visible Location <br />Elevator Pit high Water Detection <br />Verify Control Wiring to Tiger Flow <br />Remove Deluge Valve <br />Relocate Piping South Unit Bay Wall <br />Cap Cross - Connect to Seal Water <br />Grout under MOBVs <br />Gage on Sump Drawdown Pump Broken <br />Check Interior Coating Service Air Receiver, shows Rust <br />Remove PVC Pipe from Piping Area <br />Cover Missing on J -box for Tiger Flow Unit <br />Grout under Strainers Cracked and Unsightly <br />Strainer Air Valve E5 Leaking <br />Strainer Backwash Lid not Secured <br />Broken Sight Glass on Both Strainers <br />Remove or Mount Fire extinguisher Between Units 4, 5 <br />Remove Cardboard in Expansion Joint <br />Loose nut on Cantileverd Walkway, North end <br />Walkway Mounting Brackets Corroded from Leak through Wall <br />Broken Light Cover on Walkway, near Unit 6 <br />Light Bulb Burned out on Crane Access Platform <br />Access Covers on EIM Operators not Secured <br />6432 Elevation <br />Check Valves at Sewage Ejector <br />Leak and Insulation on Hot Water Circ. Pump <br />Conduits Supports on Sump Pumps Need Repair <br />Pullbox Cover Open Overhead by Intake Duct <br />Properly Store Spare Belts for main air handler Currently in Unit <br />Hot Water Control Valve Leaks <br />Repair Insulation On Hot Water Control Valve <br />Replace Flex Conduit on Fire Damper, Not Spec <br />Door Latch on main air handler Not Working <br />Start <br />Mon 6/4/12 <br />Mon 8/22/11 <br />Wed 6/15/11 <br />Fri 10/1/10 <br />Wed 2/8/12 <br />Wed 2/8/12 <br />Mon 3/5/12 <br />Mon 6/25/12 <br />Tue 2/7/12 <br />Mon 7/2/12 <br />Fri 10/1/10 <br />Mon 12/26/11 <br />Tue 3/1/11 <br />Tue 3/1/11 <br />Tue 3/1/11 <br />Mon 3/5/12 <br />Tue 3/1/11 <br />Thu 2/23/12 <br />Mon 8/22/11 <br />Fri 5/4/12 <br />Fri 4/20/12 <br />Tue 4/24/12 <br />Thu 12/1/11 <br />Thu 4126/12 <br />Mon 6/4/12 <br />Tue 1/17/12 <br />Sun 5/1/11 <br />Fri 10/21/11 <br />Tue 1/24/12 <br />Mon 8/22111 <br />Fri 10/1/10 <br />Fri 3/2/12 <br />Mon 8122/11 <br />Fri 10/1/10 <br />Mon 12/12/11 <br />Mon 8/22/11 <br />Mon 8/22/11 <br />Mon 8/22/11 <br />Mon 5/28/12 <br />Wed 1/4/12 <br />Fri 10/1/10 <br />Mon 1/23/12 <br />Fri 1011/10 <br />Mon 1/23/12 <br />Thu 12/1/11 <br />Fri 2/3/12 <br />Fri 10/1/10 <br />Mon 8/22/11 <br />Fri 10/1/10 <br />Fri 1/6/12 <br />Fri 3/16/12 <br />Mon 8122/11 <br />Finish <br />Fri 6/29/12 <br />Mon 8/22/11 <br />Wed 6/15/11 <br />Fri 8/31/12 <br />Tue 3/20/12 <br />Tue 3/20/12 <br />Fri 3/30/12 <br />Fri 6/29/12 <br />Mon 4/30/12 <br />Fri 7/13/12 <br />Thu 10/7/10 <br />Fri 8/31/12 <br />Wed 3/2/11 <br />Tue 3/1/11 <br />Mon 3/28/11 <br />Fri 3/30/12 <br />Tue 3/1/11 <br />Wed 2/29/12 <br />Mon 8/22/11 <br />Thu 5/31/12 <br />Thu 5/31/12 <br />Mon 4/30/12 <br />Fri 12/30/11 <br />Mon 4/30/12 <br />Fri 6/29/12 <br />Wed 1/25/12 <br />Fri 5/13/11 <br />Fri 11/18/11 <br />Wed 1/25/12 <br />Fri 8/26/11 <br />Fri 10/1/10 <br />Thu 3/15/12 <br />Wed 8/24/11 <br />Fri 10/1/10 <br />Fri 12/23/11 <br />Mon 8/22/11 <br />Mon 8/22/11 <br />Mon 8/22/11 <br />Thu 5/31/12 <br />Tue 1/17/12 <br />Fri 10/1/10 <br />Fri 1/27/12 <br />Fri 3/30/12 <br />Wed 1/25/12 <br />Wed 1/25/12 <br />Fri 2/10/12 <br />Fri 10/1/10 <br />Mon 8/22/11 <br />Mon 10/4/10 <br />Mon 1/9/12 <br />Fri 3/30/12 <br />Mon 8/22/11 <br />I Jan '10 Feb'10 <br />Mar'10 I A r'10 Ma '10 Jun '10 Jul .10 <br />Au '10 <br />27 3 10 17 1 24 31 <br />7 14 21 28 7 14 21 1 28 1 4 1 11 1 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 <br />Cover Missing o <br />Strainer <br />Light Bulb Burned out <br />Pullbox Cover Ope <br />Hot <br />55 <br />56 <br />57 <br />58 <br />59 <br />60 <br />62 <br />63 <br />64 <br />65 <br />66v <br />67 <br />68 <br />69 <br />70 <br />71 <br />72 <br />73 <br />74 <br />75V <br />76 <br />77 <br />78 <br />79V <br />80 <br />81 <br />82 <br />83 <br />84 <br />85 <br />86 <br />87 <br />88 <br />89 <br />90 <br />91 <br />92 <br />93 <br />94 <br />95 <br />96 <br />97 <br />98 <br />99 <br />100 <br />101 <br />102 <br />103 <br />104 <br />105 <br />106 <br />Project: <br />Date: Sun <br />ALP O &M TRANSFER ISSUE <br />3/4/12 <br />Task Milestone <br />Progress Summary <br />♦ <br />Rolled Up Task <br />Rolled Up Milestone O <br />Rolled Up Progress External Tasks Group By Summary <br />Split , , , , , , , , , , , , , , , , , , , Project Summary —' Deadline O <br />Page 2 <br />