My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 21
CWCB
>
ALP Project
>
ALP 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 1:15:16 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ALL ITEMS - ALP TRANSFER ISSUES SCHEDULE <br />3 -5 -12 UPDATE: 52.2% COMPLETE <br />ID <br />Task Name <br />Start <br />Finish <br />I Jan'10 Feb'10 mar 110 A r'10 Ma '10 1 Jun'10 1JU1,10 <br />Au '10 <br />27 1 3 10 1 17T-2-4131 <br />7 14 21128 1 7 _J14 21128 4 11 18 25 2 9 16 23 30 1 6 13 20 27 4 11 1 18 1 25 1 8 15 <br />A -LP Project Wide <br />Prov <br />Provide ArcFlash Training ,g,,,,,,,,,,, <br />Transfer Inspe <br />Durango Pumping Plant <br />Plant -Wide <br />Repair Ice Damage EIFS <br />1 <br />A -LP Project Wide Mon 8/2110 Fri 9/28/12 <br />Designer's Operating Criteria Documents Mon 7/2/12 Wed 8/29/12 <br />Standing Operating Procedure Documents Mon 8/20/12 Fri 9/28/12 <br />C3V As -built Drawings Fri 10/7/11 Fri 3/30/12 <br />Emergency Action Plan Mon 4/9/12 Fri 6/29/12 <br />a. Design Summary Documents Tue 7/3/12 Thu 9/27/12 <br />Equipment Manuals Tue 1/3/12 Fri 3/30/12 <br />r.q s6> HECP and LOTO Programs Tue 1/3/12 Thu 6/14/12 <br />r Hearing Protection Program Tue 1/3/12 Wed 2/1/12 <br />Accusonic Flow Meters 0.5% Accuracy Documentation Thu 2/16/12 Fri 3/30/12 <br />Cathodic Protection Reports Tue 1/3/12 Fri 3/30112 <br />Label all valves, panels, breakers, switches, end devices, and recepticles Fri 3/2/12 Fri 3/30/12 <br />Identify Specific Equipment powered by E -G's Mon 4/23/12 Fri 4/27/12 <br />74 Identify Specific Load Requirements for all E -G's Mon 4/23/12 Fri 4/27/12 <br />Provide ArcFlash Training Mon 8/2/10 Fri 11/18/11 <br />g <br />3 Review Draft Design Summary Documents Fri 6/1/12 Mon 7/2/12 <br />Review Draft DOC Documents Tue 1/3/12 Mon 7/2/12 <br />Review Draft SOPs Tue 1/3/12 Mon 7/2/12 <br />74 Transfer Inspection Wed 9/1/10 Wed 2/29/12 <br />Transfer Inspection Report Thu 3/1/12 Fri 3/30/12 <br />Spare Parts Inventory Mon 11/28/11 Fri 3/30/12 <br />ArcFlash Study and Report Mon 4/9/12 Fri 6/29/12 <br />n7 PM Program Loaded into CMMS System Mon 4/2/12 Fri 8/31/12 <br />Durango Pumping Plant Mon 8/2/10 Fri 9/28/12 <br />Site Work Sun 5/1/11 Thu 7/26112 <br />V Post No Tresspassing Signs Sun 5/1/11 Tue 5/10/11 <br />Mitigate Erosion top of Retaining Wall (S. paved area) Fri 4/20/12 Thu 4/26/12 <br />f3 Dredge Catch Basin Wed 5/16/12 Wed 6/13/12 <br />Seal and Repair Asphalt Tue 4/17/12 Wed 4/25/12 <br />3V Replace Curb Stops Fri 7/20/12 Thu 7/26/12 <br />Write SOW for additional fencing installation Wed 2/1/12 Wed 2/29/12 <br />_74 V Install additional Fencing per SOW Mon 4/30/12 Thu 5/17/12 <br />Fix Leakage at Pump Seals Tue 5/1/12 Thu 5/31/12 <br />Plant -Wide Mon 8/2/10 Fri 6/29/12 <br />! Crane Certs and Insp. Reports Mon 3/5/12 Fri 3/9/12 <br />7 V Elevator Certs and Insp. Reports Mon 3/19/12 Fri 3/23/12 <br />�j Repair Ice Damage Roof Mon 8/22/11 Fri 11/18/11 <br />Repair Ice Damage EIFS Mon 8/2/10 Fri 9/30/11 <br />✓ Install sign for elevator room door Tue 12/13/11 Tue 12/13/11 <br />�/ Guard Elevator Moving Parts Mon 11/21/11 Fri 11/25/11 <br />Fire Stop Elevator Duct Chase Mon 8/22/11 Mon 8/22/11 <br />f Temp /Humid Monitoring elevator Room Mon 1/2/12 Tue 1/3/12 <br />V Elevator Brake Missing Anchor Mon 8/22/11 Thu 10120111 <br />V Flowmeter Transducer Removal Tool Thu 3/1/12 Fri 3/30/12 <br />COD Line flowmeter installation inspection Mon 3/26/12 Fri 3/30/12 <br />f Cranes Need cutoff Switch at end of Travel Mon 2/6/12 Mon 4/30/12 <br />North Stairwell Conduit Penetration needs Cap Mon 8/22/11 Tue 9/6/111 <br />�V Paint Discoloration at DPP Mon 4/16/12 Fri 4/20/12; <br />Post Elevator Certification Tue 4/3/12 Mon 4/30/12 <br />ftij Repair Phone in Elevator Tue 1/3/12 Tue 1/3/12 <br />Security Schematic w/ Room #s Thu 3/1/12 Fri 3/30112 <br />74\,- HVAC test and balance Tue 1/17/12 Wed 2/29/12 <br />Fire Alarm system final testing Wed 5/30/12 Thu 5/31/12 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11V <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20V <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />27 <br />28 <br />29V <br />30 <br />31 <br />32 <br />33 <br />34 <br />35 <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />44 <br />45V <br />46 <br />47 <br />48 <br />49 <br />50 <br />51 <br />52 <br />53 <br />Project: ALP O &M TRANSFER ISSUE <br />Date: Sun 3/4/12 <br />Task <br />Progress <br />Milestone O <br />Summary <br />Rolled Up Task ___ <br />Rolled Up Milestone O <br />_._ Rolled Up Progress External Tasks Group By Summary <br />Split ,,, Project Summary 9 Deadline <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.