Laserfiche WebLink
ANIMAS - LA PLATA WATER SUPPLY AND DEMAND STUDY <br />4. CONCLUSIONS AND RECOMMENDATIONS <br />4.1 Sale of the State's Allocation Under Existing Conditions <br />Based on this investigation, it is Brown and Caldwell's conclusion that a total of approximately 500 -1,000 AF <br />of the State's allocation can be sold without further assistance or involvement by the State or other parties <br />(see Table 41). <br />•. ssible Water Sale <br />Water Provider <br />from State's 10,460 AF Allotment <br />Possible Water Sale (AFIYR) <br />City of Durango <br />0 <br />La Plata Archuleta Water District <br />500 -1000 <br />La Plata West Water Authority <br />0 <br />Lake Durango Water Authori ty <br />0 <br />Pagosa Springs Water and Sanitation District <br />0 <br />San Juan Water Conservancy District <br />0 <br />Town of Bayfield <br />0 <br />Town of Ignacio <br />0 <br />TOTAL <br />500 -1000 <br />For purposes of analyzing the reasons underlying this currently limited sales potential, the group of potential <br />buyers is divided into three categories: <br />1. No Future Supplies Required <br />The City of Durango has signed an options contract with the Colorado Water and Power Authority <br />for A -LP Project water supply and is not interested in additional supply at this time. The Town of <br />Ignacio purchases its potable water supply from the Tribes and is not looking at acquiring additional <br />supplies at this point. <br />2. Expressed Need for Additional Supply <br />This group consists of La Plata Archuleta Water District, La Plata West Water Authority and Lake <br />Durango Water Authority. These entities have demand for A -LP Project water but face challenges in <br />pumping the water from Lake Nighthorse, providing for water treatment and conveying the water to <br />their service areas. Financial assistance may also be required for acquisition of the A -LP Project <br />water from the State. <br />4-1 <br />PAData1GEN\CWCB1138372 - Animas -La Plata Demand Study \Deliverables\Reports\Final\ALP Cost Demand Study Final Report -docx <br />