Laserfiche WebLink
Sec hon 3 Animas - La Plata Water Supply and Demand Study <br />capacity. Bayfield's demand was calculated to be about 500 AF based on the population of 2,000 people in <br />town and the 220 gpcd utilized in SWSI. <br />Brown and Caldwell discussed future water resource plans for Bayfield with Dirk Nelson, Town Attorney. <br />He indicated that getting A -LP Project Water from Lake Nighthorse would be a huge obstacle in utilizing A- <br />LP Project water. Bayfield has not approached the Tribe about leasing water from them, but this is a <br />possibility. <br />3.4.1.7 Town of Ignacio, Colorado <br />The Town of Ignacio (Ignacio) is surrounded on three sides by the Southern Ute Reservation. Ignacio has a <br />population of about 700 people and purchases potable water from the Southern Utes off of the Vallecito <br />Reservoir. In discussions with Balty Quintana, Ignacio's Town Manager, and Dirk Nelson, Town Attorney, it <br />would be highly unlikely that Ignacio would purchase A -LP Project water from the State because they would <br />not want to upset their relationship with the Tribe and use of this water would require the construction of a <br />water treatment plant. <br />3-7 <br />P 1Data1GEN1CWCM138372 - Animas -La Plata Demand Study \Deliverables\Reports\FinaftALP Cost Demand Study Final Report.docx <br />