Laserfiche WebLink
Part E - Document No. Document Title <br />Special Provisions <br />R10AV40R04 Recovery — Permanent Operating Facility, Animas -La Plata E -1 <br />Pro ect No. 3.000 TAS::14 0681::TAS <br />PART E — SPECIAL PROVISIONS <br />E -1 STRUCTURE <br />This clause describes the construction contract format being used to design and <br />construct features of the Animas -La Plata Project. This construction feature <br />(Permanent Operating Facilities) of the project has seven Attachments: <br />Attachment 1 Master Agreement of Terms and Conditions for Construction <br />Attachment 2 ARRA Terms and Conditions <br />Attachment 3 DOI Checklist <br />Attachment 4 Davis Bacon Wage Determination <br />Attachment 5 Drawings <br />Attachment 6 Performance Schedule <br />Attachment 7 Example Design Phase I and Phase If Source Selection Plan <br />This contract incorporates by reference the 2008 Guiding Principals for Federal <br />Leadership in High Performance and Sustainable Buildings (Guiding Principles), the <br />Department of Interior Construction Checklist, and the United States Green Building <br />council LEED Rating System. <br />E -2 FAR COMMENCEMENT, PROSECUTION AND <br />52.211.10 COMPLETION OF WORK APR 1984 <br />The Contractor shall be required to: (a) commence work under this contract within 10 <br />calendar days after the date the Contractor receives the notice to proceed (NTP), (b) <br />Prosecute the work diligently, and (c) complete the parts of the work ready for use as <br />stated below: <br />Work Completion <br />All items of work NLT July 31, 2011 <br />in the Schedule <br />It is recognized that the work shall be scheduled such that construction will not <br />adversely impact the Durango Pumping Plant operation. The time stated for completion <br />shall include final cleanup of the premises. <br />E -3 FAR LIQUIDATED DAMAGES <br />52.211.12 <br />SEP 2000 <br />(a) If the Contractor fails to complete the work within the time specified in the contract, <br />the Contractor shall pay liquidated damages to the Government in the amount of <br />$850.00 for each calendar day of delay until the work is completed or accepted. <br />