My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 19
CWCB
>
ALP Project
>
ALP 19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 12:42:58 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
dart ra _ <br />Supplies or Services Document No. Document Title <br />and Prices R10AV40R04 Recovery — Permanent Operating Facility, Animas -La Plata &1 <br />Pro'ect No. 3.000 TAS::14 0681::TAS <br />PART B -- SUPPLIES OR SERVICES AND PRICES <br />B.1 The Requirements -- Negotiation <br />(a) The Contractor shall furnish the items identified in this Section, in accordance with <br />the terms, conditions, and specifications contained in the contract. <br />(b) Offerors shall complete the schedule(s) in Section B and furnish any additional <br />information required in Section B, as applicable. <br />(c) The Section I clause entitled "Payment for Mobilization and Preparatory Work" <br />applies to Schedule item(s) for Mobilization and Preparatory Work. Also, see the <br />Special Provision entitled "Payment for Mobilization and Preparatory Work." <br />B.2 The Schedule <br />a. Schedule — No pricing to be included in Design Phase 1— Request for <br />Qualiiifications <br />CLIN r�elerence <br />Sectlon <br />1 F01 ial <br />ons <br />20 <br />2 018110 <br />018120 <br />018130 <br />018110 <br />3 0 0 4 0 <br />Supplies or Services <br />Mobilization and Preparatory Work <br />Design High Pertormance and <br />Sustainable Permanent Operating Facility <br />including Associated Parking, <br />Infrastructure and Utilities <br />Construct High Performance and <br />Sustainable Permanent Operating Facility, <br />Including Associated Parking, <br />Infrastructure and Utilities <br />Commission Facilit�s and Facility's Site <br />Work, Including Associated Parking, <br />Unit Price Amount <br />For the Jump sum of: $ <br />For the lump sum of: I $ <br />For the lump sum of: I $ <br />For the lump sum of. I $ <br />=or the <br />For the <br />Total for Schedule I $ <br />
The URL can be used to link to this page
Your browser does not support the video tag.