My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 18
CWCB
>
ALP Project
>
ALP 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 12:10:53 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCC Meeting — October 05, 2010 <br />Version: October 5, 2010 <br />iii. Total value of modifications to date — $4,724,934 <br />(a). CCE transfers — $447,622 <br />(b). Change orders — $4,277,312 <br />f. Thirteen undefinitized modifications pending finalization <br />g. Several Requests for Proposal pending <br />i. Various electrical revisions <br />(a). Getting close to a resolution of this <br />ii. HDPE fish bypass <br />iii. Various HVAC revisions <br />(a). Received a proposal and is in review <br />h. Comparison of CCE to Contract Amount <br />i. All aforementioned modification are listed <br />ii. Current contract value — $56,279,299 <br />iii. Current contingency - $2,342,624 <br />iv. Field Cost current - $58,621,923 <br />i. Durango Pumping Plant is 99% complete overall <br />i. Previously reported 99% <br />8. Ridges Basin Inlet Conduit ( #8137) <br />a. Time elapsed —100% <br />i. Previous report — 100% <br />b. Percent complete —100% <br />i. Previous report —100% <br />c. Earnings to date — $18,150,265 <br />i. Previous report — $17,723,534 <br />d. Current net contract value - $18,182,246 <br />i. Previous report — $17,729,926 <br />e. No modifications issued since last PCC meeting <br />i. CCE transfers <br />(a). None <br />ii. Change order modifications <br />(a). None <br />iii. Total value of modifications - $632,246 <br />(a). CCE transfers — $33,283 <br />(b). Change orders — $598,963 <br />f. No undefinitized modifications pending finalization <br />g. No Requests for Proposal pending <br />h. Comparison of CCE to Contract Amount <br />i. All aforementioned modification are listed <br />ii. Current contract value — $18,182,245 <br />iii. Current contingency - $1,499,515 <br />iv. Field Cost current - $19,681,760 <br />i. Ridges Basin Inlet Conduit is 100% complete overall <br />j. It was noted that the only remaining item for the RBIC is the receipt of the cathodic <br />protection testing report. <br />9. Upper County Road 211 Reconstruction ( #8216) <br />a. Time elapsed — 100% <br />i. Previous report — 93% <br />ii. See note 9.e.ii.(a) <br />G� <br />
The URL can be used to link to this page
Your browser does not support the video tag.