Laserfiche WebLink
Draft Cost Allocation Support Worksheet <br />This Spreadsheet prepared for use in Cost Allocation revisions; data based on indexed CCE at Oct. 2010(FY11) Price Level - $584.0 <br />million using the same process as the May 2001 Interim Cost Allocation. Essentially, the 584.01VI CCE was modified to match the <br />thought process used in the May 2001 Allocation. _ <br />Prepared 12/29/09 Revised: 07 -10 -10 <br />FEATURE <br />Oct. 10 (FYI 1) <br />Index/Source <br />$584.0M <br />Allocation <br />w/May 2001 <br />Interim Process <br />Ridges Basin Dam Specific Costs (Total) <br />Awarded <br />1/ <br />$ 174,579 <br />From CCE <br />$ <br />$ <br />$ <br />174,579 <br />1,045,296 <br />117,000 <br />ALP Conservanc District S c. costs <br />2/1$ <br />1,045,296 <br />From CCE <br />Durango Pumping Plant (Awarded) <br />Durango Pumping Plant Remaining <br />3/ <br />$ 117,000 <br />Stage 2 Remaining Line Item <br />Subtotal DPP <br />$ 1,162,296 <br />$ <br />$ <br />1,162,296 <br />58,193 <br />Ridges Basin Dam/steel piping & valves <br />if <br />$ 58193 <br />From CCE <br />Total ALP Conservancy District Spec. Costs <br />L <br />From CCE <br />No Index <br />From CCE <br />No Index <br />From CCE <br />From CCE <br />From CCE <br />From CCE <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />$ <br />1,220,489 <br />63,244,000 <br />20,058,193 <br />20,000,000 <br />58,193 <br />20,058,193 <br />20,000,000 <br />58,193 <br />23,360,000 <br />56,419,651 <br />21,411,000 <br />35,008,651 <br />13,080,129 <br />2,623,000 <br />10,457,129 <br />NNMP <br />$ 63,244,000 <br />SUIT <br />$ 20,058,193 <br />SUIT Tribal Resource Fund <br />$ 20,000,000 <br />Ridges Basin Dam /steel piping & valves <br />1/ <br />$ 58,193 <br />UMUT <br />$ 20,058,193 <br />UMUT Tribal Resource Fund <br />$ 20,000,000 <br />Ridges Basin Dam /steel piping & valves <br />11 <br />$ 58,193 <br />Cultural Resources <br />$ 23,360,000 <br />Fish, Wildlife, & Wetlands Mitigation <br />Mitigation Features <br />$ 21,411,000 <br />Inactive Pool <br />41 <br />$ 35,008,651 <br />Recreational Fishery <br />1/2 Fish Hatchery + Fisherman Access <br />1 <br />$ 2,623,000 <br />From CCE <br />Inactive Pool <br />41 <br />$ 10,457,129 <br />From CCE <br />1/ Specific costs equally assigned to the ALP District, UTMUT, SUIT $174,579/3 = 58,193; from Oct. 10 (FYI 1) indexed CCE. See plant <br />account 151, line item (3) Over expenditure for RBD Specific Costs ($16,579; line item (5) RB Dam Spec Costs ($158,000) Contract #8064. <br />RBD specific costs have been awarded, therefore they are not indexed. <br />2/ From Oct. 10 (FYI 1) indexed CCE. See plant account 130, line item (4) City of Durango specific costs <br />specific costs have been awarded, therefore they are not indexed. <br />awarded Contract #8013. DPP <br />3/ City of Durango specific costs remaining line item; from Oct. 10 (FYI 1) indexed CCE. See plant account 130, line item (4) remaining. <br />Remaining costs are indexed. <br />4/ Ratio to Compute Ridges Basin Dam Inactive Pool From FSEIS No Pre1999 Sunk Costs Included in RBD Costs _ <br />90,000 of w/o rec. Ml $119_600.000 X <br />120,000 of w /rec. pool $144,600,000 $262,974,069 RBD less sunks <br />Solved X = 217,508,289 $262,974,069 - 217,508,289 = $45,465,780 = 30,000 of Inactive Pool Cost <br />45,465,780 0.77 = $35,008,651 <br />From FSEIS 77% of Inactive Pool is allocated to Water Quality <br />45,465,780 0.23 = $10,457,129 <br />From FSEIS 23% of Inactive Pool is allocated to Fishery Enhancement <br />- <br />Wexcel \Interim Cost Allocation \FY11 \Draft OCT10 FY11 $584.OM Cost Alloc. Support Wrksht ry 07- 07- 10.xls <br />