Draft Capital Cost Worksheet
<br />Capital Costs at the Oct. 2010 (FY11) Price Level $584.0 Million Usin g the Same Process as the May 2001 Interim
<br />Prepared: 12 -29 -09
<br />Revised: 07 -08 -10
<br />Irrigation Set
<br />Aside Sunks 1/
<br />Other Set
<br />Aside Sunks 2/
<br />Total Set Aside
<br />Sunks
<br />Sponsors will
<br />not Pay 1/ 2/
<br />Other Sunks
<br />Non -Set Aside
<br />Sponsors will
<br />pay 31
<br />Total Sunks
<br />XLP Feature
<br />Costs (Oct.10
<br />FYI I) Price
<br />Level/Utilizing
<br />May 2001 Terms
<br />Total Feature
<br />Costs includes
<br />Total Set Aside
<br />Sunks
<br />Total Feature
<br />Costs Minus
<br />All Sunks
<br />Capital
<br />Costs
<br />RBD
<br />Lake Ni hthorse Boat Ram
<br />$18,129,107
<br />$4,027,872
<br />$0
<br />$411,271
<br />$134,258
<br />$4,027,872
<br />$0
<br />$411,271
<br />$134,258
<br />$18,129,107
<br />$30,227,931
<br />$0
<br />$6,915,839
<br />$680,034
<br />$2,777,203
<br />$4,722,291
<br />$34,255,803
<br />$0
<br />$7,327,110
<br />$814,292
<br />$0
<br />$2,777,203
<br />$0
<br />$0
<br />$4,722,291
<br />$18,129,107
<br />$293,202,000
<br />$297,229,872
<br />$262,974,069
<br />$262,974,069
<br />$3,000,000
<br />$3,000,000
<br />$3,000,000
<br />$3,000,000
<br />DPP
<br />$124,009,000
<br />$124,420,271
<br />$117,093,161
<br />$117,093,161
<br />RBIC
<br />$27,164,000
<br />$27,298,258
<br />$26,483,966
<br />$26,483,966
<br />NNMP
<br />$63,244,000
<br />$63,244,000
<br />$63,244,000
<br />$63,244,000
<br />Fish, Wildlife, and Wetlands Mitigation
<br />$21,411,000
<br />$21,411,000
<br />$18,633,7971
<br />$18,633,797
<br />Recreational Fishery
<br />$2,623,000
<br />$2,623,000
<br />$2,623,000
<br />$2,623,000
<br />Permanent Operation Facility
<br />$3,283,000
<br />$3,283,000
<br />$3,283,000
<br />$3,283,000
<br />Cull. Res.
<br />$23,360,000
<br />$23,360,000
<br />$18,637,709
<br />$18,637,709
<br />Irrigation Set Aside Sunks (includes $602,211
<br />of undelivered orders)
<br />$18,129,107
<br />$18,129,107
<br />$0
<br />$0
<br />Other Set Aside Sunks
<br />Subtotal Features without Sunks
<br />$4,573,401
<br />$0
<br />$0
<br />$515,972 702
<br />All Sunks - -
<br />$68,025,806
<br />$68,025,806
<br />$0
<br />Total
<br />$18,129,1071
<br />$4,573,4011
<br />$22,702,5081
<br />$45,323,2981
<br />$68,025,806
<br />$583,998,508 $583,998,508
<br />$583,998,508
<br />$583,998,508
<br />1/ Irrigation Set -Aside Sunks of 18.1 M (rounded) have been assigned to features that are no longer a part of the Project. Sunk irrigation costs remain part of the ALP costs since the irrigation purpose has not
<br />been deauthorized. Sunk Costs are not included as part of the reimbursable M &I costs for repayment but are set aside for future repayment. Sponsors will not pay for these sunks.
<br />2/ Other Set - Asides Sunks of $4.6 M (rounded) were expended on activities that can be considered associated with the original projects larger sized features and are therefore proposed to be non - reimbursable in
<br />this analysis. The Sponsors will not pay for these sunks.
<br />3/ Other Sunks Non -Set Aside Costs of $45,323,298 have been assigned to features of the Project. Sponsors will pay for these sunks.
<br />U: \excel \Interim Cost Allocation\FY1 1 \Draft OCT 10 FY11 $584. OM Capital Costs ry 07- 08- 10.xls