My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 15
CWCB
>
ALP Project
>
ALP 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2016 8:45:03 AM
Creation date
4/2/2013 4:34:48 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 3 <br />2.1.5 Durango Pumping Plant is the pumping plant and appurtenant facilities to be <br />located adjacent to the Animas River that will pump water from the Animas River through the <br />Ridges Basin Inlet Conduit into Lake Nighthorse (previously known as Ridges Basin Reservoir) <br />and/or directly to facilities of the City of Durango. <br />2.1.6 Funding Agreement is the Funding Agreement and Repayment Contract <br />between the United States and the Colorado Water Resources and Power Development Authority, <br />Contract No. 02 -WC -40 -8000, executed November 9, 2001. <br />2.1.7 General Items of Specific Costs means items of Specific Costs pursuant to the <br />Funding Agreement that are provided solely for the benefit of purchasers or users of the ALPD <br />Depletion Allocation, and that benefit all purchasers or users of such ALPD Depletion Allocation, as <br />defined and described in Paragraph 2.5 of the Marketing Agreement. The General Items of Specific <br />Costs payable by a purchaser of a portion of the ALPD Depletion Allocation is determined by <br />dividing the number of acre feet of ALPD Depletion Allocation purchased by 2,600, and multiplying <br />the result by the total Specific Costs attributable to General Items of Specific Costs. <br />2.1.8 Initial Option Payment Calculation means the calculation of various charges <br />that is set forth on Appendix 1 hereto and used to determine the initial option payment to be made <br />hereunder. <br />2.1.9 Marketing Agreement means the Marketing Agreement between Colorado <br />Water Resources and Power Development Authority and Animas -La Plata Water Conservancy <br />District entered into on October 15, 2002, as the same may have been, and may be, amended. <br />2.1.10 Prepaid Specific Costs means those Specific Costs prepaid as apart of the up- <br />front Payment Obligation by the Authority. The Prepaid Specific Costs comprise $580,400 of <br />Special Items of Specific Costs for the Durango Pumping Plant, and $2,000 of General Items of <br />Specific Costs for the Ridges Basin Dam. <br />2.1.11 Special Items of Specific Costs means items of Specific Costs pursuant to the <br />Funding Agreement that benefit a particular purchaser or user of the ALPD Depletion Allocation, as <br />defined and described in Paragraph 2.5 of the Marketing Agreement. The Special Items of Specific <br />Costs payable by a purchaser of a portion of the ALPD Depletion Allocation is determined by <br />dividing the number of acre feet of ALPD Depletion Allocation purchased by the total number of <br />acre feet benefited by each Special Item of Specific Costs that provides a benefit to that particular <br />purchaser, multiplying the result in each case by that portion of the Specific Costs attributable to that <br />Special Item of Specific Costs, and aggregating each purchaser' share of the various Special Items of <br />Specific Costs that benefit that purchaser. <br />
The URL can be used to link to this page
Your browser does not support the video tag.