My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 15
CWCB
>
ALP Project
>
ALP 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2016 8:45:03 AM
Creation date
4/2/2013 4:34:48 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 <br />2.1.12 Specific Costs means construction costs for items constructed by the United <br />States as a part of or in connection with the construction of the Animas -La Plata Project that benefit <br />the ALPD Depletion Allocation alone, as described in Paragraph 8 of the Funding Agreement. The <br />Specific Costs include $582,400.00 of Prepaid Specific Costs, and may also include additional <br />Specific Costs as a portion of the Additional Repayment Obligation. <br />2.1.13 Up front Payment Obligation means the Up -Front Payment Obligation <br />defined in Paragraph 8 of the Funding Agreement, which has been satisfied, pursuant to Paragraph <br />8(a) of the Funding Agreement, by the escrow of the sum of $7,256,750.00. <br />2.1.14 Water Charge means the <br />ALPD Depletion Allocation optioned herein. <br />Agreement and comprises a base water charge <br />paragraph 2.4 of the Marketing Agreement. <br />2.2 Option. <br />Water Charge to be paid for that portion of the <br />The Water Charge is defined in the Marketing <br />and an additional water charge as set forth in <br />2.2.1 Grant of Option. For and in consideration of the option payment set forth in <br />paragraph 2.2.2 hereof, and effective upon approval of this Agreement by the United States in <br />accordance with paragraph 14(a) of the Funding Agreement, the Authority hereby grants to Purchaser <br />an exclusive option to acquire a partial assignment of the Authority's rights and obligations pursuant <br />to the Funding Agreement corresponding to 1,900 acre feet of average annual municipal and <br />industrial depletions out of the ALPD Depletion Allocation. The 1,900 acre feet of ALPD Depletion <br />Allocation optioned herein shall correlate to an annual Project water supply of 3,800 acre feet for <br />municipal and industrial use, which may be supplied by a combination of water diverted directly <br />from the natural flow of the Animas River and water released from storage in Lake Nighthorse <br />(previously known as Ridges Basin Reservoir). The depletion allocation herein shall permit the use <br />of up to 2,133 acre feet of the storage allocation of 2,919 acre feet attributable to the ALPD <br />Depletion Allocation to supplement direct diversions to satisfy the annual Project water supply of <br />3,800 acre feet optioned herein. <br />2.2.2 Option Payment. <br />2.2.2.1 The initial option payment for the option granted herein is <br />$1,051,175, to be paid to the Authority by the Purchaser within ten days of written approval hereof <br />by the United States. The initial option payment equates to the greater of (1) the total of (a) 5% of <br />the currently estimated Water Charge for the portion of the ALPD Depletion Allocation optioned <br />herein; plus (b) 5% of the Prepaid Specific Costs allocated to the portion of the ALPD Depletion <br />Allocation optioned herein; plus (c) 5% of the current additional cost estimate for Special Items of <br />Specific Costs allocated to the portion of the ALPD Depletion Allocation optioned; plus (d) 5% of <br />the current cost estimate for General Items of Specific Costs allocated to the portion of the ALPD <br />Depletion Allocation optioned herein; or (2) 100% of the currently estimated Special Items of <br />Specific Costs allocated to the portion of the ALPD Depletion Allocation optioned herein. The basis <br />
The URL can be used to link to this page
Your browser does not support the video tag.