Laserfiche WebLink
ANALYSES OF <br />COSTS SPSC. TO THE.C17Y:OP;OURANGO.. <br />THROUGH ALP. DISTRICT AND COLORAdb W�IYER T ES (A -P ANb #r!OVUER DEVELOPMENT AUTHORITY. <br />. <br />DURANGO PUMPING PLANT Appraisal Foot - Appraisal Foot - Appraisal . Appraisal Jan 2003 <br />Foot - <br />. <br />COMPONENT Costs Notes Costs Oct. Notes Costs Oct. Costs Jan. Fesibility <br />Noss <br />2001 index 2002 Index 2003 Index Costs <br />FSEIIS <br />FSEIS 41 hdor - 247 factor - 252 fader-254 <br />INSIDE THE PLANT 8/ <br />Sleet ManlWd, P Ines and Valves S 315,000 , <br />Ultrasonic Flowmstar 9/ $ 108.000 101 230.E <br />31 <br />Deal & Admin. Costs S 127.000 S 43.000 <br />3/ <br />Subtotal T1 32,174 <br />S 550,000 214/ S 580.400 a/ s 592;308 S 597.009 3 305,174 <br />.1/ <br />OUTSIDE THE PLANT 8/ <br />Air Chamber. <br />Air Chambermawmeter Concrete S 200.000 <br />31 <br />Subsiruc hn <br />Dischorm PW and Alr Valve $ 178,000 <br />3/ <br />entliatlon 45valism & SUMP Punm UnN S 100' <br />31 <br />Cefhodic Protection S .40.000 <br />3/ <br />Asslan & Admin. Costs 8.000 <br />31 <br />81 90 <br />Subtotal <br />1/ <br />8 587.990 <br />TOTAL <br />11/ <br />Foot Notes: <br />1/ Design costs of $94. 164, Included; they are distributed based on owentiy estimated costs for FSEIS components inside and outside the plant <br />032.174 + $51,990 - $94,160. <br />2/ From 3- 14-2000 Email from Dole Diamond, does not Include $2,000 for specft costs associated with Ridges Basin Dam. <br />31 includes 20% contingencies; 4/ April 99 base for Indexing Is 234; 51 Used In May 2001. Interim Cost Allocation. <br />61 Does not indude the $2,000 for spedflc 0099 of Ridges Basin Dam. Total specMc costs equal ($580,400 + $2.000 = $582,400) shown <br />in the <br />amended and restated agreement and instructions for administrating escrow account between The United Slates Depart of the Interior and <br />The Colorado Water Resources and Power Development Authority, Antmes -La -Pieta Project. <br />71 Subtotal for indexed amounts B calculated by using the projected Index for that year, divided by the projected April 1999 Index of 234, tones the <br />base of 5550.000. <br />Of Based on FSEIS layout; 91 CunaMly oulslde plant; 101 Includes valve; 111 Does not include aonstrudion management coats. <br />Date: 3 -18-03; alp/ CoMStmra fAutsorWSpociticcostClndyK4a.xls <br />3. <br />O <br />1 <br />N <br />O <br />A <br />PO <br />0 <br />0 <br />-o <br />3 <br />c7 <br />4W, <br />�m <br />m <br />M, <br />C-- <br />z <br />O <br />M <br />X <br />Z <br />0 <br />•w <br />O <br />W <br />m <br />• w <br />N <br />Oo <br />N <br />O <br />cn <br />