My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 15
CWCB
>
ALP Project
>
ALP 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2016 8:45:03 AM
Creation date
4/2/2013 4:34:48 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Dmmp 1,900 AF <br />5%-$29,093 <br />Plus <br />(3) S% of current additional coat estimate for Special Ito®$ of Specific Costa <br />allocated to the portion of the ALPD Depletion Allocution optioned - $23 ,539. <br />January, 2003 Coat Estimate 8or Durango pumping plate $1,051,175, minus <br />5580,400 prepaid = $470,775 <br />5% - 523,539 <br />Plus <br />(4) S% of cmraat additional cost edmate for C,enerul Items of Specific Costs <br />allocated to the portion of the ALPD Depletion Allocation optioned - $1571. <br />January, 2003 Cost Batimato for Ridges Basin Dam - $45,000, minus $2,000 <br />prepaid = $43,000 <br />Durango share - (1,900 + 2,600) s $43,000 - $31,423 <br />5% _ $1571 <br />Total of (1� (2), (3) and (4) " S298,073 <br />B. <br />100% of currently estimated Special Raw of Specific Costs allocated to the portion of <br />the ALPD Depletion Allocaltion optioned. <br />For Durango, - S IAS 1,175 for Dur=go Pumping plant, based on Sup letter of <br />March 10, 2004. <br />71.15 CMCLUDC'S <br />PACs P. c; Z 0 F Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.