Laserfiche WebLink
CityofDutango 1,900 AF <br />Appendac 1 <br />Initial Option Payment Calculation <br />Option Payment is the greater of <br />A <br />(1) 5% of the cunnutiy estimated Water (age - $243,870. <br />(A) Base Water Charge: Number of acre feet purcbasod + 2,600 x $6,674,350 <br />For Durango: (1,900 + 2,600) x $6,674,350 = $4,877,409. <br />And <br />(B) Additional "Water Charge: pro rata share of 3.07% of Joint Project Costs in <br />wwass of 5217, 287,950 dent ern reasonable and unforeseen. At this time, <br />no additional water charge bas been de tatanned. ak wever, the Bureau of <br />RoclamatiotI has indicated drat -it anticipates an Additional Rapeymemt <br />wit Fwxling Agree ma d of $42,611 for rho ALPD <br />Thy estimated Water Charge for Durango at this time= $4 ,877,409. <br />5%- $243,870. <br />Plus <br />(2) 5% of Prepaid Specific Costs Wkcated to the portion of the ALPD Depletion <br />Allocation optioned - 529,093. <br />(A) PPS d Special Itan of Specific Costs — $i 80,400 for Durango Pumping <br />Durango share - 1000/6, or 5580,400 <br />(B) Prepaid General Items of Specific Costs = $2,000 for Ridges Basin Dam <br />Durango shag$ = (1,900 + 2,600) x $2,000 = S1462 <br />Total Durango Prepaid Specific Costs - SS81,862 <br />