Laserfiche WebLink
e. install a gage with a satellite relay monitoring station on the La Plata <br />River below the confluence of Long Hollow and the La Plata River at a <br />location acceptable to the Division 7 Engineer; <br />2. After storage of water begins in the Reservoir, and within a time acceptable to the <br />Division 7 Engineer, the LPWCD shall complete the following: <br />a. provide daily to the Division 7 Engineer, and/or his representative, <br />Reservoir elevations and a release schedule, during the period February 15 <br />through November 30 and weekly reports during the period December 1 <br />through February 14; and, <br />b. provide a plan of operations, acceptable to the Division 7 Engineer, prior <br />to the annual meeting required by paragraph VI below, for the subsequent <br />year's Reservoir operations. <br />Evaporation Accounting. Evaporation shall be assessed to the Compact Pool and <br />District Pool in proportion to each Pool's percentage of the overall active <br />Reservoir Pool capacity. <br />VI. Performance Review and Coordination <br />The Colorado State Engineer, or the State Engineer's designee, and the LPWCD Board of <br />Directors, and/or their representatives, shall meet annually, no later than February 1 of each year, <br />unless all parties to this agreement consent to a later date in writing, regarding the effectiveness <br />and progress of activities identified in this MOA. <br />Page 5 of 6 <br />