My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 14
CWCB
>
ALP Project
>
ALP 14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:01 PM
Creation date
4/2/2013 3:57:10 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
APR =02 -2004 FRI 04 :07 PM <br />WCD- DGjere <br />WTR -4.00 <br />CO #TER RES AUTHORITY FAX NO. 3038328205 <br />Uld States Department of Zetterior <br />3764 Conpen Drivk Suite 106 <br />Greed hattion CO 0150641755 <br />aURM or RECLAW"Ic i <br />Upper Colorado Region <br />Western Colorado Area Offee <br />MAR 20 2M <br />Mr. Daniel L. Law, Executive DirecW <br />Colorado Water Resources and Power Development Authority <br />1580 Logan Street, Suite 620 <br />Denver CO 80203 -1943 <br />P. 09 <br />SM E Zed AV=IM Soft 300 <br />Dump CO ILIO34M <br />Subject: Specific Costs for Durango Pumping Plant, Amended and Restated Escrow Agreement <br />with the Colorado Water Resources and Power Development Authority, Animas -La <br />Plata Prc jeep Colorado and New Mexico <br />Dear W. Law: <br />Asa follow up to our January 29, 2003 discussion and our January 23, 2003 letter to the City of <br />.Durango's Mr. Otha Rogers, we have researched information relating to specific costs. identified <br />in the November 9, 2001, Amended and Restated Escrow Agreement (Agreement) with the <br />Colorado Water Resources and Power Development Authority (Authority). Now that designs <br />and construction specifications are. complete, we are able to compare current cost estimates with <br />those included in the Authority's Agreement with Reclamation. Because there are differences in <br />the currently estimated and contracted specific costs, we are seeking input from the Authority on <br />how to proceed in this matter. <br />.The specific costs identified in the funding agreement that are allocable to the Authority are <br />$5,82,400, with 5580,400 assigned to the Durango Pumping Plant. This amount wall. derived by <br />indexing specific costs identified in the Final Supplemental Fsnvimnmental Impact Statement <br />(FSEIS). These specific costs associated with the Durango Pumping Plant would allow the City <br />of Durango to utilize project pumps to pump project water directly to the-City's terminal <br />reservoir. The $580,400 represented costs for facilities primarily within the walls of the plant <br />that should be constructed or installed at the time of plant construction. It was expected that the <br />City would provide any additional components outside of the plant necessary for them to connect <br />the plant to their raw water line. During the final design stage of the Durango Pumping.Plaat, it <br />was determined that the necessary components outside the plant should also be included in the <br />pumping plant specifications due to the need to be compatible with the plant components. This <br />would also provide for more efficient construction of those components outside -of the plant. <br />The attached spreadsheet exhibits the results of our research and our updated specific cost <br />estimates for components of the Durango Pumping Plant servicing the City of Durango. We <br />A_Cetmlry of water for the writ <br />1902 -2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.