My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 14
CWCB
>
ALP Project
>
ALP 14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:01 PM
Creation date
4/2/2013 3:57:10 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
V ��U`JJ •JWL �'- :� <br />United States Department of the Interip ]DF......� <br />BUREAU OF RECLAMATION SOMME as l <br />UPPER COLORADO REGION Nv f3 .9v <br />GRAND JUNCTION PROJECTS OFFICE <br />P.O. 807( 60340 - <br />2766 COMPASS DRIYE u� <br />GJ -400 GRAND JUNCTION, COLORADO 81506 �- <br />NOV - 7 1990 ►--- ---� Ica <br />- v <br />Memorandum <br />To: Regional Director, Salt Lake City UT '.C.. J:- / �� ~ <br />Attention: UC -400 2� <br />From: Projects Manager <br />Subject: Transfer Inspection, Ridgway Dam, Dallas Creek Project, Colorado <br />(Transfer from Construction to Operation and Maintenance) <br />The Ridgway Dam Inspection Team composed of the individuals listed in the <br />enclosed report met at the dam on September 20, 1990. The Ridgway Dam was <br />inspected in accordance with Reclamation Instructions, Paragraphs 232.0.7 and <br />232.0.8. The enclosed transfer inspection report has been prepared based on <br />the field review and subsequent discussions. <br />The report identifies some work that may not be completed until after the <br />transfer date, particularly the inspection of the upstream portion of the <br />outlet works conduit, which we recommend not be done until there is an <br />apparent need to do so. <br />It is recommended that the transfer date be set for January 1, 1991, with all <br />responsibilities for the care, operation, and maintenance of Ridgway Dam and <br />Reservoir being assumed by the Tri- County Water Conservancy District. <br />Please review the enclosed report, complete the signature page, and distribute <br />the report as required. <br />If you have any questions concerning the inspection or the report, please call <br />Fred Crabtree at FTS 326 -0655. <br />1 <br />Enclosures <br />
The URL can be used to link to this page
Your browser does not support the video tag.