Laserfiche WebLink
To: Assistant Commissioner - Resources Management <br />&tention: D -5210 Clsssifleatlon(J() <br />From: sGYtegional Director Project C �? <br />Subjects Transfer of Project Facilities from Bureau of Reel Ce11tt ol <br />(Reclamation) to Tri- County Water Conservancy Dist Wtierl.D. <br />Ridgway Dam and Reservoir -- Dallas Creek Project, <br />(Transfer Facility$ to Water District) KeywCrd <br />On September 20, 1990, representatives from the Denver Office, the Uppe //, <br />Colorado Regional Office, the Grand Junction Projects Office, the Durango / <br />Projects Office, and the Tri - County Water Conservancy District conducted a <br />joint inspection of Ridgway Dam and Reservoir, Dallas Creek Project, in <br />accordance with Reclamation Instructions, Paragraphs 232.0.7 and 232.0.8, <br />preparatory to transfer from Reclamation to the Tri- county Water Conservancy <br />District. <br />Enclosed is a copy of the Transfer Inspection Report that describes the <br />facilities to be transferred and the deficiencies that were noted. The report <br />also lists the responsible party to complete the deficiency_ Some of the <br />deficiencies may be completed after the January 1, 1991, transfer date. <br />After you have had an opportunity to review the enclosed inspection report, we <br />would appreciate receiving your written concurrence, as required in <br />Reclamation Instructions, Part 232.0.7, so that transfer can be completed by <br />January 1, 1991. If you have any questions, please contact Sporleder at <br />FTS 588 -6086. 7718 � I <br />Enclosure <br />cc: Commissioner, Attention: W -5120 (7456 -MIB) <br />Assistant Commissioner - Engineering and Research, <br />Attention: D -3500, D -3413, D -3110 <br />(each w /encl) <br />9 PAS <br />(�rG 3 1940 <br />_ <br />WEIYio <br />United States Department of the Interio <br />WLy un <br />V <br />BUREAU OF RECLAMATION <br />GATE <br />INITIALS toot <br />= <br />UPPER COLORADO REGIONAL OFFICE <br />. •fix ;,� , <br />P.O. BOX 11568 <br />SALT LAKE CITY. UTAH 811.11 <br />L\ REPLY <br />REFER TO% <br />UC -206 <br />' <br />NOV 3 01990 <br />Memorandum <br />To: Assistant Commissioner - Resources Management <br />&tention: D -5210 Clsssifleatlon(J() <br />From: sGYtegional Director Project C �? <br />Subjects Transfer of Project Facilities from Bureau of Reel Ce11tt ol <br />(Reclamation) to Tri- County Water Conservancy Dist Wtierl.D. <br />Ridgway Dam and Reservoir -- Dallas Creek Project, <br />(Transfer Facility$ to Water District) KeywCrd <br />On September 20, 1990, representatives from the Denver Office, the Uppe //, <br />Colorado Regional Office, the Grand Junction Projects Office, the Durango / <br />Projects Office, and the Tri - County Water Conservancy District conducted a <br />joint inspection of Ridgway Dam and Reservoir, Dallas Creek Project, in <br />accordance with Reclamation Instructions, Paragraphs 232.0.7 and 232.0.8, <br />preparatory to transfer from Reclamation to the Tri- county Water Conservancy <br />District. <br />Enclosed is a copy of the Transfer Inspection Report that describes the <br />facilities to be transferred and the deficiencies that were noted. The report <br />also lists the responsible party to complete the deficiency_ Some of the <br />deficiencies may be completed after the January 1, 1991, transfer date. <br />After you have had an opportunity to review the enclosed inspection report, we <br />would appreciate receiving your written concurrence, as required in <br />Reclamation Instructions, Part 232.0.7, so that transfer can be completed by <br />January 1, 1991. If you have any questions, please contact Sporleder at <br />FTS 588 -6086. 7718 � I <br />Enclosure <br />cc: Commissioner, Attention: W -5120 (7456 -MIB) <br />Assistant Commissioner - Engineering and Research, <br />Attention: D -3500, D -3413, D -3110 <br />(each w /encl) <br />9 PAS <br />