To: Assistant Commissioner - Resources Management
<br />&tention: D -5210 Clsssifleatlon(J()
<br />From: sGYtegional Director Project C �?
<br />Subjects Transfer of Project Facilities from Bureau of Reel Ce11tt ol
<br />(Reclamation) to Tri- County Water Conservancy Dist Wtierl.D.
<br />Ridgway Dam and Reservoir -- Dallas Creek Project,
<br />(Transfer Facility$ to Water District) KeywCrd
<br />On September 20, 1990, representatives from the Denver Office, the Uppe //,
<br />Colorado Regional Office, the Grand Junction Projects Office, the Durango /
<br />Projects Office, and the Tri - County Water Conservancy District conducted a
<br />joint inspection of Ridgway Dam and Reservoir, Dallas Creek Project, in
<br />accordance with Reclamation Instructions, Paragraphs 232.0.7 and 232.0.8,
<br />preparatory to transfer from Reclamation to the Tri- county Water Conservancy
<br />District.
<br />Enclosed is a copy of the Transfer Inspection Report that describes the
<br />facilities to be transferred and the deficiencies that were noted. The report
<br />also lists the responsible party to complete the deficiency_ Some of the
<br />deficiencies may be completed after the January 1, 1991, transfer date.
<br />After you have had an opportunity to review the enclosed inspection report, we
<br />would appreciate receiving your written concurrence, as required in
<br />Reclamation Instructions, Part 232.0.7, so that transfer can be completed by
<br />January 1, 1991. If you have any questions, please contact Sporleder at
<br />FTS 588 -6086. 7718 � I
<br />Enclosure
<br />cc: Commissioner, Attention: W -5120 (7456 -MIB)
<br />Assistant Commissioner - Engineering and Research,
<br />Attention: D -3500, D -3413, D -3110
<br />(each w /encl)
<br />9 PAS
<br />(�rG 3 1940
<br />_
<br />WEIYio
<br />United States Department of the Interio
<br />WLy un
<br />V
<br />BUREAU OF RECLAMATION
<br />GATE
<br />INITIALS toot
<br />=
<br />UPPER COLORADO REGIONAL OFFICE
<br />. •fix ;,� ,
<br />P.O. BOX 11568
<br />SALT LAKE CITY. UTAH 811.11
<br />L\ REPLY
<br />REFER TO%
<br />UC -206
<br />'
<br />NOV 3 01990
<br />Memorandum
<br />To: Assistant Commissioner - Resources Management
<br />&tention: D -5210 Clsssifleatlon(J()
<br />From: sGYtegional Director Project C �?
<br />Subjects Transfer of Project Facilities from Bureau of Reel Ce11tt ol
<br />(Reclamation) to Tri- County Water Conservancy Dist Wtierl.D.
<br />Ridgway Dam and Reservoir -- Dallas Creek Project,
<br />(Transfer Facility$ to Water District) KeywCrd
<br />On September 20, 1990, representatives from the Denver Office, the Uppe //,
<br />Colorado Regional Office, the Grand Junction Projects Office, the Durango /
<br />Projects Office, and the Tri - County Water Conservancy District conducted a
<br />joint inspection of Ridgway Dam and Reservoir, Dallas Creek Project, in
<br />accordance with Reclamation Instructions, Paragraphs 232.0.7 and 232.0.8,
<br />preparatory to transfer from Reclamation to the Tri- county Water Conservancy
<br />District.
<br />Enclosed is a copy of the Transfer Inspection Report that describes the
<br />facilities to be transferred and the deficiencies that were noted. The report
<br />also lists the responsible party to complete the deficiency_ Some of the
<br />deficiencies may be completed after the January 1, 1991, transfer date.
<br />After you have had an opportunity to review the enclosed inspection report, we
<br />would appreciate receiving your written concurrence, as required in
<br />Reclamation Instructions, Part 232.0.7, so that transfer can be completed by
<br />January 1, 1991. If you have any questions, please contact Sporleder at
<br />FTS 588 -6086. 7718 � I
<br />Enclosure
<br />cc: Commissioner, Attention: W -5120 (7456 -MIB)
<br />Assistant Commissioner - Engineering and Research,
<br />Attention: D -3500, D -3413, D -3110
<br />(each w /encl)
<br />9 PAS
<br />
|