My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Repayment Contract ALP
CWCB
>
ALP Project
>
CWCB Repayment Contract ALP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 2:38:13 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
{µE T 0 F- y <br />E l Inited `Mates De��artmel�t of the (1.1i.erfor <br />BUIUAU O RECLAMATION <br />Upper t;olnr3d0 Ittgioutil Of(cc <br />Weslern Colontdu Ana Office <br />,y RCH V REFER fn <br />27(x7 Cvmp,ici Drive. Suitc 106 CjY _ 3 '� 835 L 2.,1 Avenue, SWIC 300 <br />Gland lundion, CO 81506 -8785 Dutatl;a, CO 81301-5415 <br />WCD- RIZandol <br />VIN-6.20 <br />Mr. Dan Law <br />Executive Director <br />Colorado Water Rcsources and Lower <br />Dcvc)opamem .Authority <br />1580 Logan Street, Suitc 620 <br />De -fiver, C:O 80203 <br />'FAKE PRI OF-' <br />INAM 1ER ICA <br />Subject: Modification to the Methodology to Estimate the Ji lated Reimlllirsement Cap, <br />Section 207 of P.I,. 108.447, as Amended, Animas -La Plata Project, Colorado and New <br />Mexico <br />Dear Mr. 1 3w: <br />The purpose of this lctier is to consult with you regaarding a change ncecssaly in the mctllodolo6Y <br />to calculate the lnflateci Reimbarsenient (_rap (IRC) for the Animas-La Plata Project (Project). <br />-Chas Original trict11odology was described in a rTletnol'atlrlum to existil)g and potential Project <br />repayment sponsors, Licited June 7, 2006 (see attached table ftlr example of the ilriginal <br />methodology). This proposed change in methodology was discussed at the March 20, 2008 <br />Project Construction Committee (PC Q inecting and those allcoding rcquested a letter from <br />Reclaarrintion oescrihing the change. <br />We have recently determined that when the IRC was updaatcd to reflect tho latest Post indexing of <br />1110 COLISfrllCtiOn Cost E- Stilnate (CCC), the increase was proportionally greater than increases in <br />the joint Project costs. This has, the ctlixt of artificially over- iriflalting the reimbursable cap. This <br />disproportionate ine mace can be attributed to the inclusion of the following three items in the <br />amount to be inflated: <br />1) Ibc pre -199') stink costs Have been expended and, as �mch, tic not subject to indexing; <br />2) ( akijlatioil of tlae (:olotado Water Resources and Power Development Audi ority (CWRI'L)A) <br />indexed specific costs is conducted separately, as these costs are not distributed ainong the <br />Project sponsors; and <br />3) 'Chc costs associated with the Nvvaijo Nation Municipal Pipclinc (NN M1') are specific to the <br />Naavrilo Natio►i and do not impact the reirnbursablejoint costs. These costs have not been <br />expended and as such, are being indexed in their entirety. The effect of indexing on this <br />substantial poition of*Pro.ject costs resulted in further dispropoillonate increase in the IRC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.