My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Repayment Contract ALP
CWCB
>
ALP Project
>
CWCB Repayment Contract ALP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 2:38:13 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
la-IAI'1 -1_R . <br />PURPOSE ND NEED, RE(;OMMFNI)ATIONS AND COMMITMEN r <br />5.4.13 I Land Use Commitments <br />No cnvirolullental col1rInhillenIs are made. Ion land (INC resources. <br />5.4.14 1 Flazardot.IS Materials Commitments <br />Recianlati In .vill ensure tll,n the Durango I'unlping Plan!. is desiWied to nlinimA the disturbance. of <br />Contan)in; led Inalerials. Reclamation will also ensure that procedures will be developed I61- radiological <br />nlunilurin c.)f eacavalCd soils and groundwater enconnicred and that remedial procedures are planned in <br />advance l awnteract the polcnlial fur human exposure and (ur tile prcvcnliort of contaminalcll <br />groundw❑ el- release groat the constrnedon she as described under Miligaticm for Relined Alternative 4 <br />I lnrardcn Materials Impact I ill tiCc.lhill 3.14. <br />R.Cc:.lalliali )rl will ensure that all ICdcral and stale requirements pertaining, to the nlanagenlenf and <br />% handlinc; IT hazardous materials, Wed ""vies and radioactive waste arc lollowed and will include Ihust. <br />re(111iI'elllc 1Ls wllhlll collstrllcli011 CUllll -act lallhllagc inclllsivC oI collstrllc"lion salely allot clivil- )I)IIIcnial <br />compliant e as described under n)iligation liar Relined Alternative 4 1 lai.; rdous Materials Impact � in <br />Section 3.11. <br />% Reclania )n will require Iha( Construction specincamms liar Ridges Basin Dent and Reservoir, Ac <br />% Ridges B:;in Inlet Conduit, rowel relowbivm. and rdWed wurh prohibit contractors iron) disturbing Ilw <br />W� disposal L111. Reclamation will lake steps to ensure Out the disposal cell has appropriate signage to make <br />% the pnhlie aware of its presence and any personal hazards that it could present, as deserilied under <br />% Miligmioi kv Relined AlternativC 4 I laz.vllous Materials ImpliCI 3 in Section 3.1 1. <br />% RCclan al )n will confer with 1)01 -., and their Lone,- 'feral Surveillalicc and M:linlcrlance Program to <br />'X nnlloamn I the currant operational scheme and pammoe.rs foie die Bodo Canyon disposal cell. As well. <br />% ReeWmar an will reactivate sampling, and monitoring; of wells IA 1 -221 and 1--)I -1 -229 for indicator <br />% parameter including hill not limited to N-1olybdenurn, Selenium. and 1_11-alliunl, as described under <br />% Mili atiol for Relined Alternative 4 I laiardous Materials Impact 5 in Scclion 3.14. <br />Reclanlat )n will require that preconsh-noion swvcys arc conducted for non - binding, water and use <br />f;WilhiCS . nd ConvcyanCC. sysicn) Avelopment and Ihaf hazardous n)alcrial slandards rehiling to <br />construed )n are adhered to as described under Mitigation Ar Relined A1lernative 4 1 Nzarll ms IYAWAA, <br />Impact h n Section 3.14. <br />5.4.15 1 Transportation Commitments <br />Reclarnal ill will Conduct a transporialion survey prior 10 COIItiIrIlClllln of Ridges Basin Dale and <br />Reservoir and will implement methods to reduce triffie- rclatcd impact; as described under Mitip:nlion fior <br />Relined hernative 4 "Transportation Impacts I and 2 in Section 3.15. <br />Reclamation will ensure to maintain CR 21 1 roadway, shwAdw% rlrainage, and roadside to stanclarcls <br />adequale 10 avoid 1)01iCe;lbIC del;radation as described under Mitigation Ii)r Relined Allcrnalivc 4 <br />Trallspurl Ilion Impact 3 in Section 3.15. <br />Reclamation will require third -party developers of recreation facilities a1 Ridges Basin Reservoir to <br />conduct Wk oighecring Apacls analysis studies and to Wigale recreation thcility impacts nenudin t <br />5.4 ENVIR$NMENTAL COMMITMENTS 5-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.