My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Repayment Contract ALP
CWCB
>
ALP Project
>
CWCB Repayment Contract ALP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 2:38:13 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CHAP rER 5 <br />PURPOSE AND NEED. RECOMMENDA I IONS AND COMMI rMCNT;; <br />5.4.9 CURUral and Paleontologic Resources Commitments <br />Rccl nitalloll will enure. compliance wilh histoi is /archacolo ical treatment nncasurc; and disseminate '% <br />results to the Prol;i- ammmic Agreement executed to meet Section 106 re(plirencrtts for Relined '%, <br />Allermilive •a Coltul.al Impacts 1 -3 in Section 3.9. Atlachnmil I I contains if Dr-111 Anunded <br />Prograillmalic Agreement for Ilse A[Y Project. Reclamation will also finalir.e:I I lisloric Preservation '%1 <br />> > i % <br />t\1,Ina�,cment I Ian which hull the I roI r�lliimatic 1�rc ;cntent Inlc:� i�l:�r:itii�n. <br />Reclanrttloll will eusrlre compliance with miligation mcasnres dcvclope(I in ac uordance. wish Ihc Nalive <br />American Graves Protection and Repatriation Act (NAGI'RA) and kxCeillive Dicier 1.3007 as described <br />under Mitigation fnr Relined Alternalive 4 Cultural Impact 4 in Section 3.9. Appendix I I conlains a ch•all <br />NAGF'RA Plan liar the Al,l' Project. <br />RCC1a111a11011 will ensure. Ihal areas lu be disturbed are fiend surveyed prim• to crmsirtiction disturhancc <br />and will ensure that Construction murtiloring is conduciccl where deemed appropriate as described ulldcr <br />Mi(igation fnr Relined Allcrnativc'=1 Palconlologic Impact I in suelion 3.9. <br />Reelamalion will ensure that periodic shoreline nwtlitoring is Colldueled as pad ofthe. I ;tcililic <br />olm"Itiorns plan as described under Mitigation for Rclinod Altcrnativc I Pa1eont0109ic. illPart ? in <br />Section 3.9. <br />5.4.10 Agriculture Commitments <br />I.oc:lliorl, design, and consu-uction liming ol'thc NNNII' would prolc.cl airicullural land; as described % <br />under Mitigation for Relined Allernalivc 4 Agricuhurc, Impact 2 in Section 3.10. Ulf I <br />5.4.11 Recreation Commitments <br />Reclamation will pursue pumping rc�.-iC. that reduce advel-se flow el'fccls ion boaling opportunities <br />within (lie Animas River when possible and will like step., to improve public access to the river as <br />described under MiIigalion Im ReImcd AIternalive. 4 Recreation Impact; i and'' in Section ;.I I. <br />Reclamation will alter Pumping rcrimcs during periods of Cinnpctiliwe event, ,is described under <br />Miligalion for RcImcd Alternative 4 Impact 3 in Section 111. <br />Reelantatirm, as part of both the lishe•y and recreation ntiti1"ation prol;ranl, will aaluire or provide % <br />funding (nol Io exceed $500.000) for the acyuisIIion ol•pubIic access at a ill ininuIli oCtwo points on Ihc <br />Animas River between [lie I ligh Bridge and Basin Creek to reduce cfl&ls to anglers on Ihc Animas River <br />as described under Miligation (*of- Relined Allernative. 4 Recreation impact •'I in Section 3.11. <br />5.4.12 Socioeconomics Commitments <br />No environmental commilmeills are made for,ocioeconomic. resources. <br />5-17 5.4 ENVIRONMENTAL COMMI I MFN I'S <br />
The URL can be used to link to this page
Your browser does not support the video tag.