My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tracking of Modifications 3/12/09
CWCB
>
ALP Project
>
Tracking of Modifications 3/12/09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 1:12:49 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Animas - La Plata Project <br />Tracking of Modifications <br />Contract No. 04 -NA-40 -8064 <br />Ridges Basin Dam Completion <br />Modification <br />Date <br />12- Mar-09 <br />Number <br />Executed <br />Amount <br />Description of Modification <br />001 <br />19 -Apr -05 <br />$ 742,992 <br />Modification incorporates an requirement to provide physical security for the A -LP Project. Scope includes furnishing an armed guard to patrol during non- <br />002 <br />26 -0.5 <br />$ - <br />rkln construction hours. <br />Administrative Mod - Correct Funding for Mod. No. 1 <br />003 <br />28 r -05 <br />$ 303,260 <br />Final Desi In and Installation of Permanent Electrical Service to RBD <br />004 <br />14 -Jun -05 <br />$ 3,100 <br />Modification directs contract to rovide a straddle Packer for use in water testing <br />005 <br />06-Jul-05 <br />09-Aug-05 <br />18-Sep-05 <br />$ 54 000 <br />$ 7,000 <br />$ 10,000 <br />of rout holes. <br />Modification directs contractor to construct access stairwa on ri ht abutment to provide safe access to grouting operation. <br />Undefinitizad ad to install rock bolts to stabilize a rock mass on the ri ht abutment beneath the scaffoldin . <br />Undefinilized modification for the unloadin and installation of a tower for the securi em on the left abutment of the dam. <br />006 <br />007 <br />008 <br />14- Sep-05 <br />$ <br />Undefinitized modification to remove sediment which had accumulated upstream of Drop Structure 13 in preparation for the upcoming winter and spring <br />009 <br />16-Sep-05 <br />20,000 <br />$ <br />months. <br />Obli ate funds to the contract. <br />010 <br />011 <br />23 Se 5 <br />29-Se <br />$ 424,256 <br />Undefinimed modification for proposal re ration costs in accordance with the re uirements of 93 -638. <br />$ - <br />Obligate funds to the contract. <br />012 <br />25 -Oct -05 <br />21 -Oct -05 <br />21 -Oct -05 <br />$ <br />$ 300 <br />$ 8,629 <br />Correct annual f -mcn re graph in contract. <br />Definitize Modification No. 4 to provide straddle acker. <br />Modification reimburses the contractor for costs incurred for the partnering consultant <br />013 <br />014 <br />015 <br />$ <br />Pendm <br />016 <br />5 <br />5 <br />$ <br />$ - <br />$ 82,000 <br />Undefinitized Modification to allow the use of T 1 /II LA cement in lieu of T V cement due to national shortage of T V. <br />Undefinitized Modification to adjust the moisture content uirement for the Zone 1 Contact Clay laced against the dam foundation. <br />Undefinitized modification fo rovide for excavation on left abutment to adjust drains a to meet actual round conditions. <br />017 <br />018 <br />5 <br />019 <br />6 <br />=$- <br />Definitaad modification to provide for placement of filter, drain, and embankment on left abutment to adjust drainage to meet actual <br />$ 172,004 <br />ground conditions. Also <br />definilized Modification No. 18 for excavation of this area. <br />020 <br />021 <br />27-Jan <br />$ 103,636 <br />$ <br />Definitized modification to provide for revision to Drop Structures 5 through 12 and make improvements in the Basin Creek features. <br />022 <br />9,410 <br />$ <br />Definitizad mod cation for additional excavation at Drop Structure 5 wired to adjust to existin to rah <br />023 <br />1,800 <br />. <br />Modification reimburses the contractor for costs incurred for the rtnerin consultant. <br />$ <br />Obli ate funds to the contrail. <br />024 <br />167Feb 06 <br />$ 4.800 <br />Undefinitized Modfication to provide for the installation tower <br />025 <br />17 -Mar -O6 <br />17- Mar -06 <br />$ 3,200 <br />of I for the security system on the right abutment of the dam. <br />Definitize Modification No. 024 to rovide for the installation of a tower for the security stem on the right abutment. <br />Definitize Modifications Nos. 005 and 007 to provide for the installation of a tower for the security system the <br />026 <br />$ 13,90plbd <br />on left abutment and for the construction of an <br />stairway on the light abutment, <br />funds to the contract. <br />027 <br />11- r-06 <br />$ <br />028 <br />17 -Apr -06 <br />029 <br />$ 58,00tized <br />Modification to Obligate funds for rtnerin consultant through FY2007. Modification will be definitized <br />030 <br />22 -M -06 <br />$ <br />as the rtnerin sessions are conducted. <br />ed modification to adjusted the corn action re uirements for the Zone 2 and Zone 3 embankment. No increase <br />08 Ma 06 <br />$ 1,345 <br />in contract value. <br />d modification to core drill the linin of the inlet condui t to confirm ual' of concrete limn <br />031 <br />26- Jun -06 <br />. <br />payment for the purchased of Carron drums to be installed on the Cat 825 sheepsfot roller to correct the lamination being <br />$ 53,000 <br />problems encountered in <br />1 embankment. Mod does not include payment to install drums on roller. <br />Definitize Modification No. 006 to install rock bolts to stabilize a rock mass on the right abutment beneath the <br />032 <br />26-Jun -06 <br />$ 9 825 <br />scaffolding. (Originally reported as $16,825 in <br />8/06. Value corrected to $9,825 in 10/06. <br />Modification to adust unit rice n otiated in contract to account for actual costs to su I rip ra materials for the face of the dam. <br />033 <br />1 &Au -O6 <br />$ 305 500 ) <br />034 <br />29- Aug -06 <br />$ 3500,000 <br />Undefinitized modification for estimated value of fuel escalation costs in accordance with specifications requirements. Actual escalation costs will be paid, up <br />to full value of modification, on a monthly basis. <br />Obli ate funds to the contract. <br />Obli ate funds to the ntred. <br />035 <br />31 -Au -06 <br />$ - <br />036 <br />$ <br />037 <br />$ <br />)I ate funds to the contract. <br />038 <br />$ <br />Obli ate funds to the contract. <br />039 <br />$ <br />Obli ate funds to the contract. <br />040 <br />041 <br />M20-Sep-06$ <br />$ <br />$ 18 806 <br />$ <br />Modification to rovide atlditional securi ward cove a durin 0061a -offs of WCA rsonnel. P ment made under modification #001. <br />Sediment Removal and Dis I DS #13 <br />Obli ate funds to the contract. <br />042 <br />043 <br />15-Dec 06 <br />05 Jarh-07 <br />$ 50,000 <br />$ <br />$ <br />$ 8,402 <br />$ <br />$ 67 381 <br />$ 98,969 <br />$ 70,000 <br />$ - <br />$ 13,549 <br />Revisions to the Box Culvert Re uirements <br />Obli ate funds to the contract. <br />Obill late funds to the contract. <br />D Structure 10 & 12 Inlet Material Placement Revisioins <br />ate funds to the contract. <br />Backfill Concrete at Control House and Chute <br />Definitize 043 and Wheeler Access Road/Box Culvert Revision <br />Basin Creek Drain Toe Drain and 1 'on Well Revisons <br />Obli ate funds to the contrail. <br />Adds ressure switches, check valve filters, etc. to.hydraulic power unit <br />044 <br />045 <br />046 <br />UMn-07 <br />047 <br />07 -Feb-07 <br />048 <br />09-Mar-07 <br />049 <br />18 r -07 <br />050 <br />O6 Mar -07 <br />051 <br />05-M -1 7 <br />052 <br />06 -Jun -07 <br />053 <br />15-Jun <br />-07 <br />$ - <br />Obli ate funds to the contract. <br />054 <br />0�` <br />21- Jun-07 <br />25 Jul-07 <br />$ 42,594 <br />$ 18 919 <br />Provides u Dstream ri at the ruin for )t ion recemmerhdatkuh from the CRB. <br />I Piezometere to monitor roundwater at Ri ht Abutment <br />056 <br />01 -A -07 <br />$ 3,000 Increase <br />Limiation of Mod #028 - Partnerine <br />
The URL can be used to link to this page
Your browser does not support the video tag.