Laserfiche WebLink
Animas - La Plata Project <br />Tracking of Modifications <br />Contract No. 04 -NA -40 -8064 <br />Ridges Basin Dam Completion <br />modification <br />Number <br />Date <br />Executed <br />i c- rviar -ua <br />Description of Modification <br />057 <br />01-Aug-07 <br />Modficetion of O.W. i e saddle <br />058 <br />OB Au -07 <br />tAmount <br />,000 <br />Su of sleeve valve i e. <br />059 <br />23 Au -07 <br />Definitize Mod #057 Mod of O.W. i saddle su orts <br />060 <br />05-Se 7 <br />- <br />Obli ate funds to the contract. <br />061 <br />25-Se 7 <br />,36 <br />Misc. Electrical Revisions Concuit/Conductor /Etc. <br />062 <br />18-Sep-07 <br />$ 1,188 <br />Dismantal and Remove Rt. Abutment Security Camera System <br />063 <br />26-Sep-07 <br />$ - <br />Obligate funds to the contract. <br />064 <br />29-Sep-07 <br />$ - <br />Obligate funds to the contract. <br />065 <br />19 -Oct-07 <br />$ 6,234 <br />Drop Structure 7 & 8 Inlet Material Placement Revisioins <br />066 <br />19 -Oct-07 <br />$ 3,873 <br />Revisions to Control House and Chute Foundation <br />067 <br />02- Nov -07 <br />$ - <br />Obligate funds to the contract. <br />068 <br />07 -Dec-07 <br />$ 205,884 <br />Drop structures access trail improvements. Consists of improving the access from La Posta Road to the existing access road downstream of the dam. <br />Improvements will result in a permanent maintenance access road. <br />069 <br />10 -Dec-07 <br />$ - <br />Obligate funds to the contract. <br />070 <br />05 -Feb-08 <br />$ 561,549 <br />Placement of ravel surfacing on all roads and parking areas. <br />071 <br />11- Jan-08 <br />$ 43,497 <br />Continued partnering efforts. <br />072 <br />05 -Feb-08 <br />$ 29,510 <br />Provides power to the left abutment security cameras, for the previous two ears. <br />073 <br />25 -Feb-08 <br />$ 3,565 <br />Definitizes Mod #58, and provides support for the sleeve valve at the outlet works. <br />074 <br />19- Feb-08 <br />$ - <br />Obligate funds to the contract. <br />075 <br />26 -Feb-08 <br />$ 199,700 <br />a demolition and removal of debris from Ridges Basin portion of the reservoir clearing tasks. <br />076 <br />25- Mar-08 <br />$ 7,208 <br />Provides for bullet resistant doors at the control house, and some rock shielding at the 36" pipe. <br />077 <br />27- Feb-08 <br />$ 8,325 <br />Provides trench work for Installation of the Dower and controls conduits at the security gates. <br />078 <br />08- Mar -08 <br />$ 7,000 <br />Excavlion in the inlet trench, in order to breach the cofferdam and inlet trench, to allow gradual filling of the inters ace during filling. <br />079 <br />080 <br />31 -Mar -08 <br />24- Mar -08 <br />$ 2,785 <br />$ <br />Definitize modification #78 excavation at inlet trench to allow gradual filling of the inters ace between the dam and the cofferdam. <br />Pull box and conduit revisions, superseded by modification #81. <br />081 <br />10-Apr-08 <br />$ <br />Pull box and conduit revisions. <br />082 <br />29-Apr-08 <br />$ 4,100 <br />Stockpile excess Zones 2 and 3 materials for First Fill operations. <br />083 <br />30-Apr-08 <br />$ 850 <br />Revisions to conduit to allow for LPEA power requirements. <br />084 <br />085 <br />086 <br />087 <br />13-M <br />13-Ma -08 <br />18- Jun-08 <br />18 -Jun -08 <br />$ 250,000 <br />$ 20,000 <br />$ 104,000 <br />$ 15,300 <br />Increases the value of modification #34, which reimburses the contractor for escalation in the price of fuel. <br />Provides for the procurement of culvert materials for Access Roads B and C, for drainage at Borrow Area B, and at the control house. <br />Provides for the installation of of culverts supplied by modification #85, except for the control house, which is installed per modification #88. <br />Provides for widening the left abutment of the dam crest road by approximately 10 feet, to create a turn around point for vehicles on the dam. <br />088 <br />089 <br />03- Jul -08 <br />09- Ju1-08 <br />$ 73,743 <br />$ 1,100,000 <br />Installation of a crash gate on crest road, vertical pivot gate at control house, security grilles on exterior wall penetrations at control house, security gate on <br />drop structure access trail, deletion of gate at Wheeler's Crossing, installation of electrical components for gates, revisions to fencing to accommodate gates, <br />and installation of a culvert. <br />Line Item Overruns, between 100 and 115° of Schedule Qtys <br />090 <br />15-Jul -08 <br />$ 8,000 <br />Bedding for RCP Pipe for CR211 Relocation <br />091 <br />23-Ju1 08 <br />$ 133,000 <br />Reservoir Clearing - Vegitation <br />092 <br />31-Jul -08 <br />$ 302,266 <br />CR211 Reconstruction Cleans <br />093 <br />01-Aug-08 <br />$ <br />FY 2008 Funding Reallocation <br />094 <br />08-Aug-08 <br />$ <br />Admistrative changes to Mod 092 <br />095 <br />04-Sep-08 <br />Line Item Overruns/Underruns through 7/25/08 <br />096 <br />22 -Se <br />$ 14.363 <br />Replace Hydraulic Fluid for OW Gates <br />097 <br />17 -S 08 <br />$ - <br />Payment Address Change <br />098 <br />29-Se <br />$ <br />FY 2008 Funding <br />099 <br />7 -Oct-08 <br />$ <br />FY09 Funding <br />100 <br />25-Nov -08 <br />$ 3 448 <br />Partnering - Defcntizes Mods 028, 056 and 071 <br />101 <br />12- Jan-09 <br />$ 24 453 <br />Enlarge Air Intake Opening in EG Bldg <br />102 <br />29- Jan-09 <br />$ 6,031 <br />F & 118 -inch Culver at the Wheelerspur road <br />103 <br />3-Apr-09 <br />$ 15,844 <br />Instrumenation Pier Deletion <br />104 <br />17-Apr-09 <br />$ 2,078 <br />Prefill Intake and Leval Gage <br />105 <br />12 -Ma <br />$ - <br />Administrative Mod - Reallocation of Funds <br />106 <br />13-Ma <br />$ 3,700 <br />Faciliate Fish Stu and To ff Prefill of Intake Pipe <br />107 <br />30- Dec -09 <br />$400,000.00 <br />Settlement of REA for Tunnel Linina and Mechanical Work <br />Total <br />$ 8,667,773 <br />