My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Animas-La Plata Operation, Maintenance, & Replacement Association Meeting Minutes 7/7/10
CWCB
>
ALP Project
>
Animas-La Plata Operation, Maintenance, & Replacement Association Meeting Minutes 7/7/10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 12:28:57 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No. 09 -SLC -0645 <br />successors and assigns; each sometimes hereinafter called "Party," and sometimes <br />hereinafter collectively called the "Parties." <br />2. EXPLANATORY RECITALS <br />2.1 The Salt Lake City Area Integrated Projects, hereinafter called the Integrated <br />Projects, encompass certain facilities for the production of electric power and <br />energy. Western transmits power and energy over the Colorado River Storage <br />Project (CRSP) transmission system and transmission systems of other utilities. <br />2.2 Reclamation constructed the Animas -La Plata Project, hereinafter called the <br />Project, as a participating project of the CRSP. <br />2.3 The Contractor shall assume responsibility for operation and maintenance of the <br />Project facilities through Reclamation's transfer process as outlined in Section 5 <br />of the Operation, Maintenance, and Replacement Contract (Contract No. 10 -WC- <br />40 -370), dated December 30, 2009, between the Contractor and Reclamation, <br />hereinafter called the OM &R Contract and incorporated into this Contract and <br />implemented and provided therein. However, during any period in which the <br />United States is performing the OM &R of the Project facilities, as provided in <br />Section 7 of the OM &R Contract including assuming responsibility for electric <br />service under this Contract, Reclamation will be considered the Contractor under <br />the terms and conditions of this Contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.