Laserfiche WebLink
Contract No. 09 -SLC -0645 <br />successors and assigns; each sometimes hereinafter called "Party," and sometimes <br />hereinafter collectively called the "Parties." <br />2. EXPLANATORY RECITALS <br />2.1 The Salt Lake City Area Integrated Projects, hereinafter called the Integrated <br />Projects, encompass certain facilities for the production of electric power and <br />energy. Western transmits power and energy over the Colorado River Storage <br />Project (CRSP) transmission system and transmission systems of other utilities. <br />2.2 Reclamation constructed the Animas -La Plata Project, hereinafter called the <br />Project, as a participating project of the CRSP. <br />2.3 The Contractor shall assume responsibility for operation and maintenance of the <br />Project facilities through Reclamation's transfer process as outlined in Section 5 <br />of the Operation, Maintenance, and Replacement Contract (Contract No. 10 -WC- <br />40 -370), dated December 30, 2009, between the Contractor and Reclamation, <br />hereinafter called the OM &R Contract and incorporated into this Contract and <br />implemented and provided therein. However, during any period in which the <br />United States is performing the OM &R of the Project facilities, as provided in <br />Section 7 of the OM &R Contract including assuming responsibility for electric <br />service under this Contract, Reclamation will be considered the Contractor under <br />the terms and conditions of this Contract. <br />