Laserfiche WebLink
Total Number of Systems Completing Monitoring Plan <br />with CBU Assistance (Coaches and Interns) <br />26'3 <br />20101 <br />2011 <br />411 <br />1a� <br />Running Total <br />Total Each Yeai <br />201_' <br />• The coaching workgroup continues to provide valuable coaching assistance. <br />PLEASE NOTE the following charted data represents a change in the metrics. <br />Previously the graph included any visit the coach made regardless if the coaching <br />report was complete, from now and into the future, a visit will be counted when <br />the coaching report has been received: <br />W. i,�bl. <br />O. 1,1b,, <br />2012 Coaching Site Visits* <br />r,,,,_ <br />a <br />ro <br />15 <br />M h <br />1,- Vic"„I>., M." <br />A..Vu,l ..ant <br />Go .l <br />*This count includes all systems for which a coach provides a system representative with coaching or <br />assistance (including coach -lead MP assistance). Coaching reports are prepared for each event. These events <br />do not necessarily take place at the system itself. <br />7 of 9 Safe Drinking Water Program Dec 7, 2012 <br />