Laserfiche WebLink
ANIMAS LA PLATA PROJECT <br />LIST OF CLOSEOUT ITEMS AND STATUS <br />Priority 1 <br />SCADA <br />Estimated <br />Amount <br />Status <br />Meeting scheduled for 11/8 <br />$96,000 <br />Fencing <br />$110,000 <br />Work underway <br />Pump Coatings <br />$400,000 <br />Evaluating method to implement <br />Crest Gates <br />$500,000 <br />In design <br />Silt Build -Up in Intake <br />$260,000 <br />Design completed <br />Equipment Storage Building <br />$500,000 <br />In procurement <br />Butterfly Valves <br />$41,164 <br />Awarded <br />Misc Tools <br />$50,000 <br />In procurement <br />Dump Truck <br />$160,000 <br />In procurement <br />Install wall mounted jib crane to access #8 Suction Valve <br />$20,000 <br />In design <br />Relocate Powerline on top of RBD <br />$10,000 <br />Coordinating with LPEA <br />Large signs on Dam face "Closed to Public" & buoy string <br />$20,000 <br />In design <br />Fence Around RBIC Outlet Structure (top of hill) <br />$7,500 <br />In design <br />Buoy String @ RBIC outlet (energy dissipation structure) <br />$3,000 <br />In design <br />Priority 2 <br />Asphalt Repairs <br />$20,000 <br />In procurement <br />HVAC <br />$3,000 <br />In procurement <br />Sump Vibration Issue <br />$40,000 <br />In procurement <br />Code Call System <br />$20,000 <br />In procurement <br />Replace all project batteries where required <br />$10,000 <br />On hold per agreement with OMRA <br />Replace Curb Stops <br />$3,500 <br />In procurement <br />Elevator Pit high Water Detection <br />$12,000 <br />Planning stage <br />Install safety net over service bay "open" crane access to unit <br />bay (across existing concrete parapet wail) <br />$3,000 <br />Planning stage <br />Lock Cylinders Missing on Workroom Doors <br />$1,000 <br />On hold per agreement with OMRA <br />Complete HVAC @ Control House <br />$5,000 <br />Coordinating the Contractor <br />Re -key all exterior doors <br />$2,000 <br />On hold per agreement with OMRA <br />Priority 3 <br />Blind Flanges <br />$15,000 <br />Included in valve package <br />Fire Suppresion System <br />$8,000 <br />In procurement <br />Air Chamber Muffler <br />$3,000 <br />In design <br />Fish Outfall Safety Grating <br />$26,000 <br />Design completed <br />Stairs on Unit #1 <br />$10,000 <br />On hold per agreement with OMRA <br />Trashrake System <br />$1,000,000 <br />On hold per agreement with OMRA <br />Label all valves, panels, breakers, switches, end devices, and <br />recepticles <br />$2,000 <br />Ongoing <br />Spare Parts Inventory <br />$3,000 <br />Ongoing <br />Designer's Operating Criteria Documents <br />$4,000 <br />Under review <br />Spare Parts <br />$5,000 <br />Ongoing <br />ArcFlash Study and Report <br />$3,000 <br />In design <br />Mitigate Erosion top of Retaining Wall (S. paved area) <br />$5,000 <br />In design <br />Fire Alarm system final testing <br />$10,000 <br />In procurement <br />Relocate Piping South Unit Bay Wall <br />$5,000 <br />Parts being procured <br />Walkway Mounting Brackets Corroded from Leak through <br />Wall <br />$2,000 <br />In design <br />Bus Gallery Misc elec parts (lump sum) <br />$2,000 <br />Ongoing <br />RBIC Air Piping - replace condensate dump <br />$500 <br />Evaluating potential fix <br />Remount Guard Valve Operators <br />$10,000 <br />Evaluating potential fix <br />Install hose bib in 4 -inch bypass in RBD control house <br />'basement" <br />$2,000 <br />OMRA to perform <br />Install hose bibs in tunnel <br />$10,000 <br />OMRA to perform <br />Establish Communications from RBD Control House for Dam <br />monitoring <br />1 $10,000 <br />In design <br />Install limit switches on the discharge gates and valves <br />1 $15,000 <br />1 Evaluating need <br />