Laserfiche WebLink
within the Storable Flow and Project Flow Rate, and delivered to the point where a Project <br />Participant's allocation will be diverted and placed to beneficial use (or confirmed present at <br />the State line for the Navajo Nation or SJWC, see Part X below); and (4) the amount that is <br />diverted for beneficial use will be accounted for under the A -LP Decrees. <br />The A -LP OM &R Association will need to establish an internal process for, inter alia, (1) <br />allocating the Storable Flow between pumping to storage and Non - stored Allocations (as well <br />as allocating it among the Project Participants) consistent with the limitations of this Protocol; <br />(2) communicating to the Division Engineer's Office the request for delivery of a Non - stored <br />Allocation, (3) acquiring additional data necessary to determine the transportation loss, if any; <br />(4) reporting to the Division Engineer in advance the points where Project water is to be <br />diverted by all Project Participants in Colorado; and (5) recording and maintaining records of <br />the amount delivered to Project Participants. <br />The Division Engineer's Office will require that all water accounted for under the A -LP <br />Decrees must be put to beneficial use and that regular and reliable records be kept so that the <br />Division Engineer can account for water use under the A -LP Decrees. <br />VII. HOW THE DIVISION ENGINEER WILL DETERMINE THE AMOUNT AVAILABLE UNDER THE <br />DIRECT FLOW RIGHTS: <br />A. Measurement: <br />Adequate measuring structures are required at the points of diversion for the Direct <br />Flow Rights before water may be diverted under those rights. The USGS gage on the Animas <br />River at Tall Timbers Resort above Tacoma, Colorado (Id. No. 09359500) (hereafter "Tall <br />Timbers Gaging Station ") is close to the Teft point of diversion. There are no gages at the <br />original points of diversion on Falls Creek or Junction Creek. Therefore, this Protocol only <br />discusses measurement "at Teft," and "the Teft Limitations," but the same terms will apply to <br />use of the other two Direct Flow Rights if and when measurement devices are installed at their <br />original points of diversion so that they may be used for Project.purposes.. _.... _ �.. <br />The Division Engineer's Office will evaluate the amount physically available at Teft based <br />on the flows at Tall Timbers Gaging Station. <br />The amount physically available at the DPP will be measured using the USGS gage on the <br />"Animas River Below Durango Pumping Plant Near Durango, Colorado" (Id. No. 09362520) <br />(hereafter "DPP Gage ") that is approximately 1/8 mile downstream of the DPP. <br />B. Transportation Loss: <br />When the A -LP OM &R Association asks the Division Engineer to identify and measure <br />water at Teft for diversion at the DPP or for a Non - stored Allocation, the quantity may include <br />additional water to cover transportation losses, if any, to the DPP. This will not cause injury to <br />any other water right, will not expand use under the A -LP Decrees, and is not precluded by the <br />9 <br />