Laserfiche WebLink
Loan Feasibility Study for <br />Raw Water Acquisition and Utilization <br />Page 5 <br />5. PHYSICAL SUPPLY SYSTEM <br />5.1 WATER SUPPLY DEMANDS <br />The current number of taps on the District's billing register is 1,701 taps (1,838 ERU). At build -out, <br />the District plans to service 3,240 taps (4,347 ERU). Before the drought of 2002, the District <br />experienced an annual demand per active tap of up to 0.41 acre -feet per tap (af/tap). Since 2002, the <br />demand per active tap has dropped significantly, in part to an awareness by District customers of the <br />limited availability of the Beaver Creek supply. For future planning purposes, the District uses an <br />annual municipal demand of 0.37 af/tap (0.28 af/ERU). Based on an annual demand of 0.37 af/tap <br />(0.28 af/ERU), the demand for the District at build -out of 3,240 taps (4,347 ERU) will be <br />approximately 1,200 af/year. The District's historical water demand since 1991 and estimated future <br />demand is shown on Figure 2. <br />Figure 2 <br />Penrose Water District <br />Future Water Demand <br />1,400 9 District projected build out demand <br />I I I I 1 I I reached in about 2040. <br />I I I I I I I <br />I I I I I I I I I <br />I I I I I I I I I <br />I I I I I I I I I <br />1,200 - - - - - - I -- - - - - - - - - - - - -'- - - - - - - - - - - - - -'- <br />I I I <br />Estimated Future Demand I I <br />I I 1 I I <br />at Build Out I p <br />1,200 af/year <br />I I I I I I <br />3,240 taps <br />1,000 - - - - - - i - - - - - - I 4,347ERUs <br />cW I I I I I I I <br />I I I I I I <br />A �$ Projected demand reaches <br />md 800 - - - - - - - - - - - - - -- - - - - -I - - -- ------ - -I - -- -- 1--- - - - -I- the "contract table amount" -- <br />3 <br />u I 1 I I I I in approximately 2029. <br />O <br />yam.. I 1 I I I I 1 <br />y I I I I I I I I I <br />(~ I I I I I I I I <br />I I I 1 I I I <br />C00- - _ _ _ - L _ _ _ L - - _ _ _ L _ _ L - - - - - - L - - - - - - L - - - - - _I_ - - - - - _I_ - - - - - - - - - - _ - - <br />I 1 I I I I I <br />I I I I I I I <br />I I I I I I I I <br />I I I I I <br />— — Projected Future Demand <br />400 - --- r- - - - - -r - -- - r -- - - - - r- - - - - - r- - - - - -r - —OP'HistoricalDemand <br />I I I I I I 1 <br />I I I I I I I <br />--N— Contract Table Amount <br />I I I I I I I <br />- 0—Demand at Build Out <br />I I I I I I I <br />200 <br />1990 1995 2000 2005 2010 2015 2020 2025 2030 2035 2040 <br />Calander Year <br />Since 1997, the average annual demand for water by the District has been approximately 489 af/year <br />[1.3 of /day or 0.4 million gallons per day (MGD)]. Of this demand, approximately 80 percent <br />Leonard Rice Engineers, Inc. August 2006 — 1018PEN05 <br />GMS, Inc. <br />